UNPACKING AND INSTALLATION
This chapter provides unpacking and installation information for the
Unpacking
Carefully unpack the contents of the
One
One AC power cord, suitable for the local electrical power voltage requirements
Four rubber feet to be used for shock cushioning Screws and two mounting brackets
And Quick Installation Guide
If any item is found missing or damaged, please contact the reseller for replacement.
Installation
The site chosen for installation greatly affects the
•Install the Switch in a fairly cool and dry place. See Technical Specifications for the acceptable temperature and humidity operating ranges.
9