Cisco Systems 3750-E, 3560-E manual Completing the Setup Program

Page 97

Appendix C Configuring the Switch with the CLI-Based Setup Program

Entering the Initial Configuration Information

Default gateway (router)

Enable secret password

Enable password

Telnet password

Completing the Setup Program

If your switches are stacked and there are multiple console connections to individual switches in the stack, the initial setup dialog appears at the console where you first press Enter.

Follow these steps to complete the setup program and to create an initial configuration for the switch:

Step 1 Enter Yes at the following two prompts.

Would you like to enter the initial configuration dialog? [yes/no]: yes

At any point you may enter a question mark '?' for help.

Use ctrl-c to abort configuration dialog at any prompt.

Default settings are in square brackets '[]'.

Basic management setup configures only enough connectivity for management of the system, extended setup will ask you to configure each interface on the system.

Would you like to enter basic management setup? [yes/no]: yes

Step 2 Enter a host name for the switch, and press Return.

On a command switch, the host name is limited to 28 characters; on a member switch to 31 characters. Do not use -n, where n is a number, as the last character in a host name for any switch.

Enter host name [Switch]: host_name

Step 3 Enter an enable secret password, and press Return.

The password can be from 1 to 25 alphanumeric characters, can start with a number, is case sensitive, allows spaces, but ignores leading spaces. The secret password is encrypted, and the enable password is in plain text.

Enter enable secret: secret_password

Step 4 Enter an enable password, and press Return.

Enter enable password: enable_password

Step 5 Enter a virtual terminal (Telnet) password, and press Return.

The password can be from 1 to 25 alphanumeric characters, is case sensitive, allows spaces, but ignores leading spaces.

Enter virtual terminal password: terminal-password

Step 6 (Optional) Configure Simple Network Management Protocol (SNMP) by responding to the prompts. You can also configure SNMP later through the CLI, the device manager, or the Network Assistant application. To configure SNMP later, enter no.

Configure SNMP Network Management? [no]: no

Catalyst 3750-E and Catalyst 3560-E Switch Hardware Installation Guide

 

OL-9774-03

C-3

 

Image 97
Contents Text Part Number OL-9774-03 Americas HeadquartersPage N T E N T S Connecting Devices to the Ethernet Ports Wiring the DC-Input Power Source Accessing the CLI Through the Console Port C-1 Purpose AudienceConventions Viii Related PublicationsPreface OL-9774-03 Part Number Description Switch ModelsFront Panel Description Switch Part Number Description24- and 48-Port Switch Front Panel PoE Ports 10/100/1000 Ethernet PortsSFP Modules Gigabit Ethernet Module SlotsCisco TwinGig Converter Module LEDs 24- and 48-Port Switch LEDsColor System Status System LEDMaster LED Power Supply LEDsColor RPS Status ColorFan LED Mode LED Port Mode DescriptionPort LEDs and Modes Port Mode Port LED Color Meaning Color PoE Status PoE LEDStack LED Stack LEDRear Panel Description 24- and 48-Port Switch Rear PanelStackWise Ports Catalyst 3560E-12D Switch Rear Panel48-Port Switch Power-Supply Modules Power-Supply ModulesSwitch Port PoE Port non-PoE Port Non-PoEDC-Power-Supply Module LEDs Description AC-Power-Supply Module LEDsModule LEDs Description Fan ModulesManagement Ports RPS ConnectorManagement Options Network Configurations Safety Warnings Preparing for InstallationOL-9774-03 Switch Installation Preparing for Installation Statement 371-Power Cable and AC Adapter Box Contents Installation GuidelinesTools and Equipment Switch Stacking Guidelines Planning a Switch Stack Catalyst 3750-E SwitchesStack Cabling Configurations Example of a Stack with Full Bandwidth Connections Stack Bandwidth and Partitioning ExamplesExample of a Stack with a Failover Condition Power On Sequence for Switch StacksRack-Mounting Installing the SwitchRack-Mounting Brackets Attaching the Rack-Mount Brackets 10 Removing Screws from the Switch11 Attaching Brackets for 19-inch Racks Mounting the Switch in a Rack Mounting the Switch in a RackWall-Mounting Attaching the Brackets to the Switch for Wall-MountingMounting the Catalyst 3560E-12D Switch on a Wall Mounting the Catalyst 3560E-12SD Switch on a Wall Table- or Shelf-Mounting After Installing the SwitchConnecting to the StackWise Ports Catalyst 3750-E Switches Installing X2 Transceiver Modules and Converter Modules Installing Devices in the 10-Gigabit Ethernet SlotsModule inserted face up Module inserted face down 202046 Removing an X2 Transceiver Module or Converter Module Installing SFP ModulesInstalling an SFP Module Lower SFP modules are inverted on 24- and 48-port switches Removing an SFP Module Connecting Devices to the Ethernet PortsPoE Port Connections 10/100/1000 Ethernet Port ConnectionsDevice Crossover Cable Switch Installation Connecting Devices to the Ethernet Ports Where to Go Next OL-9774-03 Installation Overview Power Supply and Fan Module InstallationOL-9774-03 Inserting the AC-Power Supply in 24- and 48-Port Switches Installing an AC-Power SupplyAC-Power Supply with Power Cord Retainer Installing a DC-Power SupplyGrounding the Switch Preparing for InstallationStripping the Ground Wire See -9for the Catalyst 3560E-12SD ground location Inserting the DC-Power Supply in 24- and 48-Port Switches Installing the DC Power Supply in the SwitchWiring the DC-Input Power Source 12 Inserting the Fan Module in 24- and 48-Port Switches Installing a Fan Module202049 OL-9774-03 Check Switch Post Results Diagnosing ProblemsCheck Switch Connections Check Switch LEDsBad or Damaged Cable Ethernet and Fiber CablesPort and Interface Settings Transceiver IssuesPoE Connections Ping End Device Check Switch PerformanceSpanning Tree Loops Speed, Duplex, and AutonegotiationAutonegotiation and NIC Cards How to Clear the Switch IP Address and ConfigurationCabling Distance How to Replace a Failed Stack Member Finding the Switch Serial NumberTroubleshooting How to Replace a Failed Stack Member OL-9774-03 Environmental Ranges Physical SpecificationsPower Specifications Table A-5 OL-9774-03 Connector Specifications Connector and Cable SpecificationsGigabit Ethernet Module Interfaces 10/100/1000 PortsFigure B-4 Duplex LC Cable Connector Console Port 10/100 Ethernet Management PortGigabit Ethernet X2 Transceiver Module Cable Specifications Cable and Adapter SpecificationsModal X2 Product Wavelength Core Size Bandwidth Number Microns MHz/kmX2 Product Transmit Power Receive Power Number SFP Module Cable SpecificationsTransmit DBm Wavelength nm652 43.4 to 62 miles 1530 To 100 km 1570 1610 Four Twisted-Pair Cable PinoutsTwo Twisted-Pair Cable Pinouts Two Twisted-Pair Crossover Cable SchematicIdentifying a Crossover Cable Switch Console RJ-45-to-DB-9 Port DTEConsole Port Adapter Pinouts Device Switch Console RJ-45-to-DB-25 Port DTE Accessing the CLI Through Express Setup Accessing the CLIAccessing the CLI Through the Console Port IP Settings Entering the Initial Configuration InformationConnecting to the Console Port Completing the Setup Program Line vty 0 These choices appear OL-9774-03 Numerics IN-2 IN-3 IN-4 IN-5 IN-6
Related manuals
Manual 20 pages 4.95 Kb