Cisco Systems 4490 manual Preparing for Installation Safety Warnings

Page 39

Chapter 2 Preparing for Installation

Safety Warnings

Warning When installing or replacing the unit, the ground connection must always be made first and disconnected last.

Warning After installing system components in a rack, never pull more than one component out of the rack on its slide assemblies at one time. The weight of more than one extended component could cause the rack to tip over and injure someone.

Warning Stability hazard. The rack stabilizing mechanism must be in place, or the rack must be bolted to the floor before you slide the unit out for servicing. Failure to stabilize the rack can cause the rack to tip over.

Warning To prevent bodily injury when mounting or servicing this unit in a rack, you must take special precautions to ensure that the system remains stable. The following guidelines are provided to ensure your safety:

This unit should be mounted at the bottom of the rack if it is the only unit in the rack.

When mounting this unit in a partially filled rack, load the rack from the bottom to the top with the heaviest component at the bottom of the rack.

If the rack is provided with stabilizing devices, install the stabilizers before mounting or servicing the unit in the rack.

Warning This equipment is to be installed and maintained by service personnel only as defined by AS/NZS 3260 Clause 1.2.14.3 Service Personnel.

Warning The safety cover is an integral part of the product. Do not operate the unit without the safety cover installed. Operating the unit without the cover in place will invalidate the safety approvals and pose a risk of fire and electrical hazards.

 

 

Cisco Global Site Selector 4490 Hardware Installation Guide

 

 

 

 

 

 

78-15755-02

 

 

2-5

 

 

 

Image 39
Contents Cisco Global Site Selector 4490 Hardware Installation Guide Page Cisco Global Site Selector 4490 Hardware Installation Guide Page N T E N T S Checking Connections Altitude Viii Figure B-1 Page Table A-1 Xii Preface Audience Chapter/Appendix Description How to Use This GuideDocument Title Provides Related DocumentationXvii Symbols and ConventionsVaroitus Tärkeitä Turvallisuusohjeita Bewaar Deze InstructiesAvvertenza Importanti Istruzioni Sulla Sicurezza Warnung Wichtige SicherheitshinweiseAviso Instruções Importantes DE Segurança TA Vare PÅ Disse InstruksjoneneSpara Dessa Anvisningar Varning! Viktiga SäkerhetsanvisningarXxii Introduction IntroductionSystem Hardware Features Cisco Global Site Selector 4490-Front View Front Panel Control Buttons Hardware FeaturesFront Panel LEDs LED Indicators5shows the location of back panel LEDs, and -3describes ColorIndicator Color State Description Input/Output Ports and ConnectorsGlobal Site Selector 4490 Back Panel Ports and Receptacles Ethernet Port RI Ring Indicator Pin Number Signal NameVT100/ANSI Parameters SettingsChapter Safety Warnings Site Requirements Safety Guidelines Preparing for InstallationSafety Warnings Preparing for Installation Safety Warnings Preparing for Installation Safety Warnings Preparing for Installation Safety Warnings Grounding the GSS Choosing a Site for InstallationSite Requirements Ensuring Overcurrent ProtectionGeneral Precautions Safety GuidelinesPreparing for Installation Safety Guidelines Protecting Against Electrostatic Discharge Ensuring Proper Airflow Rack Installation Safety GuidelinesLifting the System Stabilizing the SystemPreparing for Installation Safety Guidelines Installing the Cisco Global Site Selector Unpacking and Inspecting the Global Site Selector If the Product is Damaged Tools and Parts RequiredFour-Post Rack Installation Kit Installing Your Unit Cage nuts Clip nuts Installing the Chassis in a Four-Post RackRemoving the Inner Slide Rail Attaching the Inner Slide Rail to the GSS Attaching the Slide Rails to the Rack Inserting the Inner Slide Rails Attaching a Bracket to the Right Side of the GSS Installing the Chassis in a Two-Post RackAttaching the GSS 4490 to the Two-Post Rack Installing the Chassis on a Workbench or Tabletop Connecting Cables Booting the System Connecting PowerColor State Description Checking the Front Panel LEDsRemoving or Replacing a Cisco Global Site Selector Cisco Global Site Selector 4490 Hardware Installation Guide Checking the Basics Troubleshooting the System HardwareTroubleshooting the System Hardware Checking the Basics Checking Connections Troubleshooting the System Hardware Checking Connections Maintaining Your Site Environment Maintaining the Cisco Global Site SelectorTemperature Altitude HumidityDust and Particles CorrosionElectrostatic Discharge Electromagnetic and Radio Frequency Interference Magnetism Power Source InterruptionsSurge Protectors Using Power Protection DevicesLine Conditioners Uninterruptible Power SuppliesSpecification Description SpecificationsAppendix a Specifications Configuring a Modem Cabling a Modem to the GSS Connecting a Modem to the GSS 4490 Console PortFigure B-1 Console Port Connector Configuring a ModemCabling a Modem to the GSS Parameters Default Settings Regulatory Compliance EMI Class a Warning Statements Regulatory Compliance and EMI Class a WarningsEMC Regulatory ComplianceFCC Class a Warning Canada Class a Warning EMI Class a Warning StatementsUser may be requested to take appropriate countermeasures Cispr 22 Class a Warning Vcci Class a Notice for JapanHungary Class a Warning 78-15755-02 D E IN-2 IN-3 IN-4