Chapter 2 Preparing for Installation

Safety Guidelines

Ensure that cables from other equipment do not obstruct the airflow through the chassis or impair access to the power supplies or cards. Route cables away from field-replaceable components to avoid disconnecting cables unnecessarily for equipment maintenance or upgrades.

Stabilizing the System

Observe the following general precautions to stabilize the system:

Install any stabilizers that came with your equipment rack before mounting or servicing the system in the rack.

Load the rack from the bottom to the top, with the heaviest system at the bottom.

Do not stack the system on top of any other equipment. If the system falls, it can cause severe bodily injury and damage the equipment.

If you are using an equipment shelf, ensure that the shelf is constructed to support the weight and dimensions of the chassis.

If you are using a telco rack, ensure that the weight of the chassis does not make the rack unstable. Secure the telco rack with ceiling brackets if the rack is populated with heavy equipment.

Bolt the rack to the floor for stability.

Lifting the System

Observe the following general precautions when lifting the system:

Disconnect all power and external cables before lifting the system.

Ensure that your footing is solid and the weight of the system is evenly distributed between your feet.

Lift the system slowly, keeping your back straight. Lift with your legs, not with your back. Bend at the knees, not at the waist.

Depending on the weight of the system, more than one person might be required to lift it.

 

 

Cisco Global Site Selector 4490 Hardware Installation Guide

 

 

 

 

 

 

78-15755-02

 

 

2-11

 

 

 

Image 45
Contents Cisco Global Site Selector 4490 Hardware Installation Guide Page Cisco Global Site Selector 4490 Hardware Installation Guide Page N T E N T S Checking Connections Altitude Viii Figure B-1 Page Table A-1 Xii Preface Audience Chapter/Appendix Description How to Use This GuideDocument Title Provides Related DocumentationXvii Symbols and ConventionsVaroitus Tärkeitä Turvallisuusohjeita Bewaar Deze InstructiesAvvertenza Importanti Istruzioni Sulla Sicurezza Warnung Wichtige SicherheitshinweiseAviso Instruções Importantes DE Segurança TA Vare PÅ Disse InstruksjoneneSpara Dessa Anvisningar Varning! Viktiga SäkerhetsanvisningarXxii Introduction IntroductionSystem Hardware Features Cisco Global Site Selector 4490-Front View Front Panel Control Buttons Hardware FeaturesFront Panel LEDs LED Indicators5shows the location of back panel LEDs, and -3describes ColorIndicator Color State Description Input/Output Ports and ConnectorsGlobal Site Selector 4490 Back Panel Ports and Receptacles Ethernet Port RI Ring Indicator Pin Number Signal NameVT100/ANSI Parameters SettingsChapter Safety Warnings Site Requirements Safety Guidelines Preparing for InstallationSafety Warnings Preparing for Installation Safety Warnings Preparing for Installation Safety Warnings Preparing for Installation Safety Warnings Site Requirements Choosing a Site for InstallationEnsuring Overcurrent Protection Grounding the GSSGeneral Precautions Safety GuidelinesPreparing for Installation Safety Guidelines Protecting Against Electrostatic Discharge Ensuring Proper Airflow Rack Installation Safety GuidelinesLifting the System Stabilizing the SystemPreparing for Installation Safety Guidelines Installing the Cisco Global Site Selector Unpacking and Inspecting the Global Site Selector If the Product is Damaged Tools and Parts RequiredFour-Post Rack Installation Kit Installing Your Unit Cage nuts Clip nuts Installing the Chassis in a Four-Post RackRemoving the Inner Slide Rail Attaching the Inner Slide Rail to the GSS Attaching the Slide Rails to the Rack Inserting the Inner Slide Rails Attaching a Bracket to the Right Side of the GSS Installing the Chassis in a Two-Post RackAttaching the GSS 4490 to the Two-Post Rack Installing the Chassis on a Workbench or Tabletop Connecting Cables Booting the System Connecting PowerColor State Description Checking the Front Panel LEDsRemoving or Replacing a Cisco Global Site Selector Cisco Global Site Selector 4490 Hardware Installation Guide Checking the Basics Troubleshooting the System HardwareTroubleshooting the System Hardware Checking the Basics Checking Connections Troubleshooting the System Hardware Checking Connections Maintaining Your Site Environment Maintaining the Cisco Global Site SelectorTemperature Altitude HumidityDust and Particles CorrosionElectrostatic Discharge Electromagnetic and Radio Frequency Interference Magnetism Power Source InterruptionsSurge Protectors Using Power Protection DevicesLine Conditioners Uninterruptible Power SuppliesSpecification Description SpecificationsAppendix a Specifications Configuring a Modem Cabling a Modem to the GSS Connecting a Modem to the GSS 4490 Console PortFigure B-1 Console Port Connector Configuring a ModemCabling a Modem to the GSS Parameters Default Settings Regulatory Compliance EMI Class a Warning Statements Regulatory Compliance and EMI Class a WarningsEMC Regulatory ComplianceFCC Class a Warning Canada Class a Warning EMI Class a Warning StatementsUser may be requested to take appropriate countermeasures Cispr 22 Class a Warning Vcci Class a Notice for JapanHungary Class a Warning 78-15755-02 D E IN-2 IN-3 IN-4
Related manuals
Manual 20 pages 33.28 Kb Manual 94 pages 36.36 Kb