Page 61

Chapter 3 Installing the Cisco Global Site Selector 4490

Connecting Power

Connecting Power

To connect power to your AC system, follow these steps:

1.Review the safety information outlined in Chapter 2, Preparing for Installation.

2.Plug the AC power cord into the power cord receptacle at the rear of the GSS 4490 (see Figure 3-9.)

3.Connect the other end of the power cord to a power source at your installation site.

4.Power up all externally connected devices.

5.Press the power control button on the front of the GSS 4490.

Booting the System

When you power up a Cisco Global Site Selector, the boot process:

Performs hardware initialization and power-on self tests

Initializes the BIOS

Initializes the Linux boot manager, LILO (Linux Loader)

Boots the GSS image (kernel and software)

Displays the startup banner and splash screen for strong encryption

Prompts you to log in to the GSS

Note While the GSS 4490 is powering up, the green power LED on the front of the GSS 4490 is on.

At this point you are ready to use the GSS device. Refer to the Cisco Global Site Selector Configuration Guide and the Cisco Global Site Selector Command Reference for details on setting up, configuring, and using the GSS device.

 

 

Cisco Global Site Selector 4490 Hardware Installation Guide

 

 

 

 

 

 

78-15755-01

 

 

3-15

 

 

 

Image 61
Contents Cisco Global Site Selector 4490 Hardware Installation Guide Page Cisco Global Site Selector 4490 Hardware Installation Guide Page N T E N T S Checking Connections Altitude Viii Figure B-1 Page Table A-1 Xii Preface Audience Chapter/Appendix Description How to Use This GuideDocument Title Provides Related DocumentationXvii Symbols and ConventionsVaroitus Tärkeitä Turvallisuusohjeita Bewaar Deze InstructiesAvvertenza Importanti Istruzioni Sulla Sicurezza Warnung Wichtige SicherheitshinweiseAviso Instruções Importantes DE Segurança TA Vare PÅ Disse InstruksjoneneSpara Dessa Anvisningar Varning! Viktiga SäkerhetsanvisningarXxii Introduction IntroductionSystem Hardware Features Cisco Global Site Selector 4490-Front View Front Panel Control Buttons Hardware FeaturesFront Panel LEDs LED Indicators5shows the location of back panel LEDs, and -3describes ColorIndicator Color State Description Input/Output Ports and ConnectorsGlobal Site Selector 4490 Back Panel Ports and Receptacles Ethernet Port RI Ring Indicator Pin Number Signal NameVT100/ANSI Parameters SettingsChapter Safety Warnings Site Requirements Safety Guidelines Preparing for InstallationSafety Warnings Preparing for Installation Safety Warnings Preparing for Installation Safety Warnings Preparing for Installation Safety Warnings Site Requirements Choosing a Site for InstallationEnsuring Overcurrent Protection Grounding the GSSGeneral Precautions Safety GuidelinesPreparing for Installation Safety Guidelines Protecting Against Electrostatic Discharge Ensuring Proper Airflow Rack Installation Safety GuidelinesLifting the System Stabilizing the SystemPreparing for Installation Safety Guidelines Installing the Cisco Global Site Selector Unpacking and Inspecting the Global Site Selector If the Product is Damaged Tools and Parts RequiredFour-Post Rack Installation Kit Installing Your Unit Cage nuts Clip nuts Installing the Chassis in a Four-Post RackRemoving the Inner Slide Rail Attaching the Inner Slide Rail to the GSS Attaching the Slide Rails to the Rack Inserting the Inner Slide Rails Attaching a Bracket to the Right Side of the GSS Installing the Chassis in a Two-Post RackAttaching the GSS 4490 to the Two-Post Rack Installing the Chassis on a Workbench or Tabletop Connecting Cables Booting the System Connecting PowerColor State Description Checking the Front Panel LEDsRemoving or Replacing a Cisco Global Site Selector Cisco Global Site Selector 4490 Hardware Installation Guide Checking the Basics Troubleshooting the System HardwareTroubleshooting the System Hardware Checking the Basics Checking Connections Troubleshooting the System Hardware Checking Connections Maintaining Your Site Environment Maintaining the Cisco Global Site SelectorTemperature Altitude HumidityCorrosion Dust and ParticlesElectrostatic Discharge Electromagnetic and Radio Frequency Interference Magnetism Power Source InterruptionsSurge Protectors Using Power Protection DevicesLine Conditioners Uninterruptible Power SuppliesSpecification Description SpecificationsAppendix a Specifications Configuring a Modem Cabling a Modem to the GSS Connecting a Modem to the GSS 4490 Console PortFigure B-1 Console Port Connector Configuring a ModemCabling a Modem to the GSS Parameters Default Settings Regulatory Compliance EMI Class a Warning Statements Regulatory Compliance and EMI Class a WarningsEMC Regulatory ComplianceFCC Class a Warning Canada Class a Warning EMI Class a Warning StatementsUser may be requested to take appropriate countermeasures Cispr 22 Class a Warning Vcci Class a Notice for JapanHungary Class a Warning 78-15755-02 D E IN-2 IN-3 IN-4
Related manuals
Manual 20 pages 33.28 Kb Manual 94 pages 36.36 Kb