Cisco Systems 7609 manual Installing the Fan Assembly

Page 88

Chapter 5 Removal and Replacement Procedures

Removing and Replacing the Fan Assembly

Step 2 Loosen the two captive installation screws by turning them counterclockwise.

Step 3 Grasp the fan assembly with both hands and pull it outward; rock it gently if necessary to unseat the power connector from the backplane.

Warning When removing the fan tray, keep your hands and fingers away from the spinning fan blades. Let the fan blades completely stop before you remove the fan tray.

Step 4 Pull the fan assembly clear of the chassis and place it in a safe place.

Installing the Fan Assembly

Perform these steps to install the new fan assembly:

Step 1 Hold the fan assembly with the fans facing down and the FAN STATUS LED on the left. (See Figure 5-7.)

Step 2 Place the fan assembly into the front chassis cavity so it rests on the chassis, and then lift the fan assembly up slightly, aligning the top and bottom chassis guides.

Step 3 Push the fan assembly into the chassis until the power connector seats in the backplane and the captive installation screws make contact with the chassis.

Step 4 Tighten the captive installation screws.

 

Cisco 7609 Internet Router Installation Guide

5-14

OL-5079-04

Image 88
Contents Cisco 7609 Internet Router Installation Guide Corporate HeadquartersCisco 7609 Internet Router Installation Guide Preface Preparing for Installation Troubleshooting Connector and Cable Specifications B-1MT-RJB-3 Repacking the Cisco 7609 Internet Router C-1Audience OrganizationConventions Chapter Title DescriptionPage OL-5079-04 Cisco 7609 Internet Router Installation Guide OL-5079-04 Xii Obtaining Documentation Related DocumentationWorld Wide Web Ordering Documentation Documentation CD-ROMDocumentation Feedback Obtaining Technical Assistance Cisco.comTechnical Assistance Center Cisco TAC Web SiteCisco TAC Escalation Center Xviii Product Overview Product Overview Product Overview Cisco 7609 Internet Router Cisco 7609 Internet Router System Features Bandwidth and Port DensityRedundancy Architecture Cisco 7609 Internet RouterCisco 7600 Internet Router Components Fan AssemblyComponent Hot Swapping Power Supplies Cisco 7609 Internet Router Internal AirflowAC-Input Power Supply DC-Input Power Supply Load SharingEnvironmental Monitoring of the Power Supply LEDPower Supply Fan Assembly OL-5079-04 Preparing for Installation SafetySite Requirements Environmental RequirementsModule Type Watts 240 VACAmps OSM-1OC48-POS-SS+ OSM-2OC12-ATM-MM, -SI OSM-4GE-WAN-GBIC WS-X6K-S2U-MSFC2 Power Connection Guidelines Power RequirementsAC-Powered Systems AC Power Cord Connectors for the 4000W Power Supply Site Preparation Checklist DC-Powered SystemsPlanning Activity Verified By Time Date Installing the Cisco 7609 Internet Router Unpacking the Cisco 7609 Internet Router Rack-Mounting Guidelines Installing the Rack-Mount KitPart Description Received Installing the Shelf and Crossbar Brackets Required ToolsInstalling the Shelf Brackets Installing the L Brackets and Cable Guides Attaching L Brackets and Cable Guides Installing the Cisco 7609 Chassis in the Rack Installing the Cisco 7609 Chassis in the Rack Installing the Stabilizer Kit Quantity Part Description ReceivedInstalling the Stabilizer Brackets System Ground Connection Required Tools and EquipmentWire-stripping tool Installing the Power Supplies in the Cisco 7609 Chassis Connecting the System GroundConnecting the Supervisor Engine Console Port Attaching the Interface CablesSupervisor Engine Console Port Connector OL-5079-04 Connecting the Supervisor Engine Uplink Ports Connecting the Supervisor Engine Uplink PortsConnecting to the Interface Ports SC-Type Fiber-Optic Connector10 LC Fiber-Optic Connector Verifying Cisco 7609 Chassis Installation OL-5079-04 Troubleshooting Problem Solving to the System Component Level Getting StartedIdentifying Startup Problems Cisco 7600 Series Internet Router Module Installation Guide Troubleshooting the Power Supply Troubleshooting the Fan Assembly Troubleshooting ModulesContacting Customer Service OL-5079-04 Removal and Replacement Procedures Removing and Replacing the Power Supply Removing an AC-Input Power SupplyAC-Input Power Supply Front Panel Handling an AC-Input Power Supply Installing an AC-Input Power Supply Removing a DC-Input Power Supply DC-Input Power Supply Front Panels DC-Input Wire Connections on the Terminal Block Handling a DC-Input Power Supply Installing a DC-Input Power Supply DC-Input Power Supply Connectors Removing and Replacing the Fan Assembly Removing the Fan Assembly Fan AssemblyInstalling the Fan Assembly Checking the Installation OL-5079-04 Technical Specifications Specification EnvironmentalCisco 7609 Internet Router Power Supplies 2500W AC- and DC-input Power Supplies4000W AC-input Power Supply Regulatory Standards ComplianceConnector and Cable Specifications Connector SpecificationsGigabit Interface Converters, page B-6 RJ-45 MT-RJCisco 7609 Internet Router Installation Guide Figure B-3 LC Fiber-Optic Connector SC-TypeGigabit Interface Converters WS-G5484WS-G5486 WS-G5487Cable Specifications Console Port Mode SwitchConsole Port Mode 1 Signaling and Pinouts Identifying a Rollover CableDB-9 Adapter for Connecting to a PC DB-25 Adapter for Connecting to a TerminalRollover Cable Modem Adapter Signal RJ-45 Pin DB-25 Pin Modem AdapterRJ-45-to-DB-25 Terminal Console RJ-45-to-RJ-45 RJ-45-to-DB-25Console Port Mode 2 Signaling and Pinouts Console Port Console Device Pin signal Input/OutputPatch Cord Configuration Example Mode-Conditioning Patch CordPatch Cord Installation Differential Mode DelayFigure B-9 LED Transmission Compared to Laser Transmission Appendix B Connector and Cable Specifications Repacking the Cisco 7609 Internet Router Figure C-1 Packing Material Figure C-2 Final Package OL-5079-04 Numerics IN-2 IN-3 IN-4 IN-5 IN-6