Cisco Systems 7609 manual Required Tools, Installing the Shelf and Crossbar Brackets

Page 48

Chapter 3 Installing the Cisco 7609 Internet Router

Installing the Rack-Mount Kit

Note Chassis height is measured in rack units (RU).

Caution If the rack is on wheels, ensure that the brakes are engaged or that the rack is otherwise stabilized.

This kit is not suitable for use with racks with obstructions (such as a power strip) that could impair access to field-replaceable units (FRUs).

Required Tools

These tools and equipment are required to install the rack-mount kit:

Number 1 and number 2 Phillips-head screwdrivers

3/16-inch flat-blade screwdriver

Tape measure and level

Installing the Shelf and Crossbar Brackets

To install the shelf and crossbar brackets, perform these steps:

Step 1 Position one of the two shelf brackets in the rack as shown in Figure 3-1.

Step 2 Secure the shelf bracket to the rack by using three 12-24 x 3/4-inch or 10-32 x 3/4-inch screws.

Step 3 Repeat Steps 1 and 2 for the second shelf bracket. Make sure that the second shelf bracket is level with the first bracket.

Step 4 Attach the crossbar bracket to the back of the shelf brackets using two M3 screws as shown in Figure 3-2.

 

Cisco 7609 Internet Router Installation Guide

3-4

OL-5079-04

Image 48
Contents Cisco 7609 Internet Router Installation Guide Corporate HeadquartersCisco 7609 Internet Router Installation Guide Preface Preparing for Installation Troubleshooting Connector and Cable Specifications B-1MT-RJB-3 Repacking the Cisco 7609 Internet Router C-1Audience OrganizationConventions Chapter Title DescriptionPage OL-5079-04 Cisco 7609 Internet Router Installation Guide OL-5079-04 Xii Related Documentation Obtaining DocumentationWorld Wide Web Documentation CD-ROM Ordering DocumentationDocumentation Feedback Obtaining Technical Assistance Cisco.comTechnical Assistance Center Cisco TAC Web SiteCisco TAC Escalation Center Xviii Product Overview Product Overview Product Overview Cisco 7609 Internet Router Cisco 7609 Internet Router System Features Bandwidth and Port DensityRedundancy Architecture Cisco 7609 Internet RouterFan Assembly Cisco 7600 Internet Router ComponentsComponent Hot Swapping Power Supplies Cisco 7609 Internet Router Internal AirflowAC-Input Power Supply DC-Input Power Supply Load SharingEnvironmental Monitoring of the Power Supply LEDPower Supply Fan Assembly OL-5079-04 Preparing for Installation SafetySite Requirements Environmental Requirements240 VAC Module Type WattsAmps OSM-1OC48-POS-SS+ OSM-2OC12-ATM-MM, -SI OSM-4GE-WAN-GBIC WS-X6K-S2U-MSFC2 Power Connection Guidelines Power RequirementsAC-Powered Systems AC Power Cord Connectors for the 4000W Power Supply Site Preparation Checklist DC-Powered SystemsPlanning Activity Verified By Time Date Installing the Cisco 7609 Internet Router Unpacking the Cisco 7609 Internet Router Installing the Rack-Mount Kit Rack-Mounting GuidelinesPart Description Received Installing the Shelf and Crossbar Brackets Required ToolsInstalling the Shelf Brackets Installing the L Brackets and Cable Guides Attaching L Brackets and Cable Guides Installing the Cisco 7609 Chassis in the Rack Installing the Cisco 7609 Chassis in the Rack Installing the Stabilizer Kit Quantity Part Description ReceivedInstalling the Stabilizer Brackets System Ground Connection Required Tools and EquipmentWire-stripping tool Installing the Power Supplies in the Cisco 7609 Chassis Connecting the System GroundConnecting the Supervisor Engine Console Port Attaching the Interface CablesSupervisor Engine Console Port Connector OL-5079-04 Connecting the Supervisor Engine Uplink Ports Connecting the Supervisor Engine Uplink PortsConnecting to the Interface Ports SC-Type Fiber-Optic Connector10 LC Fiber-Optic Connector Verifying Cisco 7609 Chassis Installation OL-5079-04 Troubleshooting Problem Solving to the System Component Level Getting StartedIdentifying Startup Problems Cisco 7600 Series Internet Router Module Installation Guide Troubleshooting the Power Supply Troubleshooting the Fan Assembly Troubleshooting ModulesContacting Customer Service OL-5079-04 Removal and Replacement Procedures Removing and Replacing the Power Supply Removing an AC-Input Power SupplyAC-Input Power Supply Front Panel Handling an AC-Input Power Supply Installing an AC-Input Power Supply Removing a DC-Input Power Supply DC-Input Power Supply Front Panels DC-Input Wire Connections on the Terminal Block Handling a DC-Input Power Supply Installing a DC-Input Power Supply DC-Input Power Supply Connectors Removing and Replacing the Fan Assembly Removing the Fan Assembly Fan AssemblyInstalling the Fan Assembly Checking the Installation OL-5079-04 Technical Specifications Specification EnvironmentalCisco 7609 Internet Router Power Supplies 2500W AC- and DC-input Power Supplies4000W AC-input Power Supply Regulatory Standards ComplianceConnector and Cable Specifications Connector SpecificationsGigabit Interface Converters, page B-6 RJ-45 MT-RJCisco 7609 Internet Router Installation Guide Figure B-3 LC Fiber-Optic Connector SC-TypeGigabit Interface Converters WS-G5484WS-G5486 WS-G5487Cable Specifications Console Port Mode SwitchConsole Port Mode 1 Signaling and Pinouts Identifying a Rollover CableDB-9 Adapter for Connecting to a PC DB-25 Adapter for Connecting to a TerminalRollover Cable Modem Adapter Signal RJ-45 Pin DB-25 Pin Modem AdapterRJ-45-to-DB-25 Terminal Console RJ-45-to-RJ-45 RJ-45-to-DB-25Console Port Mode 2 Signaling and Pinouts Console Port Console Device Pin signal Input/OutputPatch Cord Configuration Example Mode-Conditioning Patch CordPatch Cord Installation Differential Mode DelayFigure B-9 LED Transmission Compared to Laser Transmission Appendix B Connector and Cable Specifications Repacking the Cisco 7609 Internet Router Figure C-1 Packing Material Figure C-2 Final Package OL-5079-04 Numerics IN-2 IN-3 IN-4 IN-5 IN-6