Rack-Mounting the Router in a 19-Inch 2-Post Rack
Use the following procedure to
Figure 3 Attaching the Mounting Brackets to the Chassis
POWER FAULT MISWIRE
1
CISCO 10000
FAIL
LINK
TX
RX
FANS | FAN |
|
OK | MULTI- | |
| FAILURE | FAN |
|
| FAILURE |
|
| C |
|
| When hot swAUTION |
|
| removal and apping this fan |
|
| be done in unredeprlacement mutray,st |
|
| system shutdowntwo minutes or |
|
| will occur. |
2 | 3 |
|
|
|
|
|
| 4 |
|
| |
|
|
| 0A |
| |
|
|
|
|
| |
|
|
|
| P | 0B |
CISCO |
|
|
| ROCESSOR | |
CISCO |
|
|
| ONLY | |
10000 | C | ISCO |
|
| |
F | 10000 |
|
| ||
AIL |
|
|
| ||
| FAIL | 10000 | CISCO |
| |
|
| FAIL | 10000 | CISCO | |
|
|
|
| ||
|
|
|
|
| 10000 |
|
|
|
| CO |
|
|
|
|
| NSOLE | CONSOLE |
| CARRIER |
|
| A | |
| ALARM |
|
| ||
| LOOP | CARRIER |
| UX |
|
|
| ALARM |
| AUX | |
| 0 | LOOP |
| ||
|
|
|
| ||
|
| 0 |
| AC |
|
|
|
|
| E TIVITY | ACTIVITY |
| 1 |
| SLOTSLO | LIN | |
|
| 0 T1 | THERNETK | LIN | |
|
|
|
| SLOTSLO | |
|
| 1 |
| 0 T1 | ETHERNETK |
| 2 |
|
|
|
|
|
| 2 |
|
|
|
| 3 |
|
|
|
|
C |
| 3 |
|
|
|
A |
|
|
|
| |
RR AL |
|
|
|
|
|
IER AR LO |
|
|
|
|
|
M OP |
|
|
|
|
|
| 4 |
|
|
|
|
|
| 4 |
|
|
|
| 5 |
|
|
|
|
|
| 5 |
|
|
|
5 | 6 |
|
|
|
|
| 7 |
| |
|
|
| 8 | |
|
|
|
| |
CISCO | CISCO |
|
|
|
10000 | C |
|
| |
10000 | ISCO |
| ||
FAIL |
| CISCO | ||
| FAIL | 10000 | ||
|
| FAIL | 10000 | |
|
|
|
| FAIL |
CARRIER |
|
|
|
|
ALARM |
|
|
|
|
LOOP | CARRIER |
|
|
|
| ALARM |
|
|
|
0 | LOOP | CARRIER |
|
|
| ALARM |
| ||
| 0 |
|
|
|
|
| 0 |
|
|
1 | 1 |
|
|
|
|
|
|
| |
|
| 1 |
|
|
2 | 2 |
|
|
|
|
|
|
| |
|
| 2 |
|
|
3 | 3 |
|
|
|
|
|
|
| |
|
| 3 |
|
|
4 | 4 |
|
| CARRIER |
|
|
|
| |
|
| 4 |
| TX RX |
|
|
|
| |
5 | 5 |
|
|
|
|
|
|
| |
|
| 5 |
|
|
POWER FAULT MISWIRE
GIGABITETHERNET | CH | ACO | PERFORMANCEROUTINGENGINE |
| PERFORMANCEROUTINGENGINE | ||||||
|
|
|
| CRITICAL |
| ACO |
|
|
|
|
|
|
|
|
|
| CRITICAL |
|
|
|
|
| |
|
|
|
| MAJOR |
|
|
|
|
|
| |
|
|
|
| MINOR |
| MAJOR |
|
|
|
|
|
|
|
|
|
|
| MINOR |
|
|
|
|
|
|
|
|
| STATUS |
| STATUS |
|
|
|
|
|
|
|
|
| FAIL |
|
|
|
|
|
| |
|
|
|
|
|
| FAIL |
|
|
|
|
|
PROCESSOR ONLY
| 30012 |
Warning | At least three people are required to mount the chassis in the equipment rack: two people are needed to hold the |
| chassis in place while a third person tightens the mounting screws. Statement 234 |
Step 1 Attach the two mounting brackets to the chassis so the flanges are positioned at the center of the chassis. Step 2 Insert the ten mounting screws through the mounting bracket into the router, and tighten the screws.
11