Cisco Systems 10008 quick start 30012

Page 11

Rack-Mounting the Router in a 19-Inch 2-Post Rack

Use the following procedure to rack-mount the Cisco 10008 chassis in a 19-inch 2-post rack:

Figure 3 Attaching the Mounting Brackets to the Chassis

POWER FAULT MISWIRE

1

CISCO 10000

FAIL

LINK

TX

RX

FANS

FAN

 

OK

MULTI-

 

FAILURE

FAN

 

 

FAILURE

 

 

C

 

 

When hot swAUTION

 

 

removal and apping this fan

 

 

be done in unredeprlacement mutray,st

 

 

system shutdowntwo minutes or

 

 

will occur.

2

3

 

 

 

 

 

 

4

 

 

 

 

 

0A

 

 

 

 

 

 

 

 

 

 

P

0B

CISCO

 

 

 

ROCESSOR

CISCO

 

 

 

ONLY

10000

C

ISCO

 

 

F

10000

 

 

AIL

 

 

 

 

FAIL

10000

CISCO

 

 

 

FAIL

10000

CISCO

 

 

 

 

 

 

 

 

 

10000

 

 

 

 

CO

 

 

 

 

 

NSOLE

CONSOLE

 

CARRIER

 

 

A

 

ALARM

 

 

 

LOOP

CARRIER

 

UX

 

 

 

ALARM

 

AUX

 

0

LOOP

 

 

 

 

 

 

 

0

 

AC

 

 

 

 

 

E TIVITY

ACTIVITY

 

1

 

SLOTSLO

LIN

 

 

0 T1

THERNETK

LIN

 

 

 

 

SLOTSLO

 

 

1

 

0 T1

ETHERNETK

 

2

 

 

 

 

 

 

2

 

 

 

 

3

 

 

 

 

C

 

3

 

 

 

A

 

 

 

 

RR AL

 

 

 

 

 

IER AR LO

 

 

 

 

 

M OP

 

 

 

 

 

 

4

 

 

 

 

 

 

4

 

 

 

 

5

 

 

 

 

 

 

5

 

 

 

5

6

 

 

 

 

 

7

 

 

 

 

8

 

 

 

 

CISCO

CISCO

 

 

 

10000

C

 

 

10000

ISCO

 

FAIL

 

CISCO

 

FAIL

10000

 

 

FAIL

10000

 

 

 

 

FAIL

CARRIER

 

 

 

 

ALARM

 

 

 

 

LOOP

CARRIER

 

 

 

 

ALARM

 

 

 

0

LOOP

CARRIER

 

 

 

ALARM

 

 

0

 

 

 

 

 

0

 

 

1

1

 

 

 

 

 

 

 

 

 

1

 

 

2

2

 

 

 

 

 

 

 

 

 

2

 

 

3

3

 

 

 

 

 

 

 

 

 

3

 

 

4

4

 

 

CARRIER

 

 

 

 

 

 

4

 

TX RX

 

 

 

 

5

5

 

 

 

 

 

 

 

 

 

5

 

 

POWER FAULT MISWIRE

GIGABITETHERNET

CH OC-12-DSOSM-IR

6XCT3–DS0

6XCT3–DS0

ACO

PERFORMANCEROUTINGENGINE

 

PERFORMANCEROUTINGENGINE

6XCT3–DS0

6XCT3–DS0

6XCT3–DS0

OC–12/STM–4POSSM–IR

 

 

 

 

CRITICAL

 

ACO

 

 

 

 

 

 

 

 

 

 

CRITICAL

 

 

 

 

 

 

 

 

 

MAJOR

 

 

 

 

 

 

 

 

 

 

MINOR

 

MAJOR

 

 

 

 

 

 

 

 

 

 

 

MINOR

 

 

 

 

 

 

 

 

 

STATUS

 

STATUS

 

 

 

 

 

 

 

 

 

FAIL

 

 

 

 

 

 

 

 

 

 

 

 

FAIL

 

 

 

 

 

PROCESSOR ONLY

 

30012

Warning

At least three people are required to mount the chassis in the equipment rack: two people are needed to hold the

 

chassis in place while a third person tightens the mounting screws. Statement 234

Step 1 Attach the two mounting brackets to the chassis so the flanges are positioned at the center of the chassis. Step 2 Insert the ten mounting screws through the mounting bracket into the router, and tighten the screws.

11

Image 11
Contents Cisco 10008 Router Obtaining Documentation Documentation and ResourcesDocument Version History Documentation Survey Related DocumentationOrdering Documentation Documentation FeedbackProduct Documentation DVD Obtaining Technical Assistance Reporting Security Problems in Cisco ProductsCisco Product Security Overview Cisco Technical Support & Documentation Website Submitting a Service RequestDefinitions of Service Request Severity Obtaining Additional Publications and Information Quantity Description Comments Preparing for InstallationSite Preparation Recommended Tools and SuppliesInstalling the Router Lifting the Chassis Lifting the ChassisRack-Mounting the Router in a 19-Inch 4-Post Rack Power Fault Miswire30012 Attaches the chassis to the rack StepAution Rack-Mounting the Router in a 23-Inch 2-Post Rack30014 30015 Attaching the Cable-Management Bracket Attaching the Cable-Management BracketAttaching the Grounding Lug Attaching Grounding Wire to Grounding LugSuitable grounding is available. Statement Installing Line CardsOr weld the metal object to the terminals. Statement Connecting PowerConnecting DC Power to the Cisco 10008 Router Set the DC PEM switches to the Off position Removing the Safety Cover DC Power Connections Securing DC Power Cables to the Chassis Connecting AC Power to the Cisco 10008 RouterSetting AC PEM Switches to the Off Position AC Power Cord Connectors in Strain-Relief Devices Connecting Alarm Indicators Connecting CablesRemoving the Safety Cover Alarm Indicator Terminal Block Connections Alarm Indicator Wires Exiting the Safety Cover Connecting a Video Terminal to the PRE Console PortConsole Port Connection on the PRE Ethernet Network Management Cable Connections Connecting Network Management and Signal System CablesConnecting to a 100BASE-T Ethernet Network Correctly connected to the 100BASE-T Ethernet LAN Auxiliary Modem Connection Installing Network Cables to the Line CardsPower Fault Miswire Powering On the SystemStartup Display Configuring the Cisco 10008 Router at StartupBasic Configuration Using the Setup Facility Basic System Configuration Procedure Using the System Configuration DialogSpecify the IP address Routerconfig # interface FastEthernet0/0/0 Basic Configuration in Global Configuration ModeRouter# format disk0 Formatting Flash Disks and Flash CardsCLI Name Description Managing the File SystemsFile Systems Relocating the Configuration to a Flash Disk Managing Configuration Files Larger than NvramCompressing the Configuration File Exit global configuration mode Symptom Steps to Take Troubleshooting Installation ProblemsGeneral Troubleshooting Tips Switch configure terminal Troubleshooting Ethernet ConnectionsTroubleshooting the Console Port Serial Connection Page USA