Cisco Systems 10008 quick start Installing Line Cards, Suitable grounding is available. Statement

Page 18

Figure 10 Connecting the Grounding Lug to the Chassis

132825

1

1

Threaded grounding holes (2)

Warning

Never defeat the ground conductor or operate the equipment in the absence of a suitably installed ground

 

conductor. Contact the appropriate electrical inspection authority or an electrician if you are uncertain that

 

suitable grounding is available. Statement 93

 

 

Step 3 Attach the grounding lug firmly to threaded holes at the bottom rear of the chassis using two M5 screws. Step 4 Attach the grounding lug at the other end of the wire to an appropriate grounding point at your site.

Installing Line Cards

Install any line cards before you connect power. See the Cisco 10000 Series Routers Line Card Hardware Installation Guide for complete installation instructions.

18

Image 18
Contents Cisco 10008 Router Documentation Survey Related Documentation Documentation and ResourcesDocument Version History Obtaining DocumentationDocumentation Feedback Product Documentation DVDOrdering Documentation Reporting Security Problems in Cisco Products Cisco Product Security OverviewObtaining Technical Assistance Submitting a Service Request Definitions of Service Request SeverityCisco Technical Support & Documentation Website Obtaining Additional Publications and Information Recommended Tools and Supplies Preparing for InstallationSite Preparation Quantity Description CommentsInstalling the Router Lifting the Chassis Lifting the ChassisPower Fault Miswire Rack-Mounting the Router in a 19-Inch 4-Post Rack30012 Step Attaches the chassis to the rackRack-Mounting the Router in a 23-Inch 2-Post Rack Aution30014 30015 Attaching the Cable-Management Bracket Attaching the Cable-Management BracketAttaching Grounding Wire to Grounding Lug Attaching the Grounding LugInstalling Line Cards Suitable grounding is available. StatementConnecting Power Connecting DC Power to the Cisco 10008 RouterOr weld the metal object to the terminals. Statement Set the DC PEM switches to the Off position Removing the Safety Cover DC Power Connections Connecting AC Power to the Cisco 10008 Router Securing DC Power Cables to the ChassisSetting AC PEM Switches to the Off Position AC Power Cord Connectors in Strain-Relief Devices Connecting Cables Connecting Alarm IndicatorsRemoving the Safety Cover Alarm Indicator Terminal Block Connections Connecting a Video Terminal to the PRE Console Port Alarm Indicator Wires Exiting the Safety CoverConsole Port Connection on the PRE Connecting Network Management and Signal System Cables Ethernet Network Management Cable ConnectionsConnecting to a 100BASE-T Ethernet Network Correctly connected to the 100BASE-T Ethernet LAN Installing Network Cables to the Line Cards Auxiliary Modem ConnectionPowering On the System Power Fault MiswireConfiguring the Cisco 10008 Router at Startup Basic Configuration Using the Setup FacilityStartup Display Using the System Configuration Dialog Basic System Configuration ProcedureSpecify the IP address Basic Configuration in Global Configuration Mode Routerconfig # interface FastEthernet0/0/0Formatting Flash Disks and Flash Cards Router# format disk0Managing the File Systems File SystemsCLI Name Description Managing Configuration Files Larger than Nvram Compressing the Configuration FileRelocating the Configuration to a Flash Disk Exit global configuration mode Troubleshooting Installation Problems General Troubleshooting TipsSymptom Steps to Take Troubleshooting Ethernet Connections Switch configure terminalTroubleshooting the Console Port Serial Connection Page USA