Cisco Systems 10008 quick start Setting AC PEM Switches to the Off Position

Page 24

Be sure you have connected the chassis to an earth ground as instructed in the “Attaching the Grounding Lug” section on page 17, and then use the following procedure to connect AC power to the PEM:

Figure 16 Setting AC PEM Switches to the Off Position

FANS

FAN

 

 

OK

MULTI

 

 

FAILURE

FAN

-

 

 

FAILURE

WrbseyemhsdteoeonnvmahelosainhtnCusduwtdAnareUodpwTeppnIrlaiOntwcewgNiollthmmoisecnincfatuumnter.utrssaotyr,

POWER FAULT

1 2

CISCO

CISCO

10000

FA

10000

IL

FAIL

L

C

 

 

INK TX R

AR

A

 

X

RIE LAR LO

 

 

R

M OP

3 4

CISCO

C10000CISCO

F10000

AIL

F100006CT3

 

AIL

FAIL

CAR

AL

 

 

RIEARM

CAR

R

LOOP

 

 

ALAR

 

RIER LOO

0

M P

 

PORT00

1

PORT11

2

PORT22

3

PORT33

4

PORT44

5

PORT55

0A

 

 

 

 

 

 

PROCESSOR

 

0B

5

 

 

 

 

ONLY

6

CISCO

 

 

 

 

 

 

10000

 

CISCO

 

 

 

 

 

10000

 

C10000CISCO

 

 

 

 

 

 

F100006CT3

CCISCO10000

 

 

 

 

 

F100006CT3

 

 

 

 

 

AIL

CON

 

 

 

 

 

AIL

SO

 

C

 

FAIL

 

 

LE

 

ON

 

FAIL

AUX

 

 

 

SOL

 

 

 

 

 

E

 

 

 

 

 

AUX

 

 

A

 

 

 

 

 

 

CTIV

 

 

 

 

 

ET

ITY

 

AC

 

CARRAL

 

HE

 

TIV

IERARMLOO

CARRIEA

LIN

RNE

 

ET

ITY

P

LARL

K

T

 

L HE

0

R MOOP

L AC

 

 

INKRNET

PORT0

0

INK TIV

 

 

 

 

PORT0

IT

L

ACT

YIN K

IVITY

ALARMS

 

PORT11

ALARMS

PORT11

RI

 

C

 

 

TIC

C

 

MA AL

RIT

PORT22

JO

IC

M R

MA AL

PORT22

IN

JO

 

OR

R

MIN

AO

CO

R

PORT33

 

A

 

CO

PORT33

PORT44

PORT44

PORT55

PORT55

7 8

CCISCO10000

CISCO

100006CT3

FA

10000

IL

F

 

AIL

FAIL

CA

R

ALA

LO

RIER

RM

OP

PORT00

PORT11

PORT22

PORT33

C

AR

RIER

PORT44

RX

 

TX

PORT55

POWER FAULT

POWER FAULT

S

 

LOT

 

S 0

SLO

TAT

T0

FAIUS

STA

LT U

F

A S

BIL

IT

GIGABIT ETHERNET

S

PERFORMANCEROUTINGENGINE

B

P/N

PERFORMANCEROUTINGENGINE

 

 

 

ITS

 

ESR-PRE3

 

P/N ESR-PRE3

 

O

SS

N

30026

Step 1 Set the AC PEM switches to the Off position.

Step 2 Connect the power cord from the PEM to the power cord that connects to the facility VAC input.

24

Image 24
Contents Cisco 10008 Router Documentation and Resources Document Version HistoryDocumentation Survey Related Documentation Obtaining DocumentationDocumentation Feedback Product Documentation DVDOrdering Documentation Reporting Security Problems in Cisco Products Cisco Product Security OverviewObtaining Technical Assistance Submitting a Service Request Definitions of Service Request SeverityCisco Technical Support & Documentation Website Obtaining Additional Publications and Information Preparing for Installation Site PreparationRecommended Tools and Supplies Quantity Description CommentsInstalling the Router Lifting the Chassis Lifting the ChassisPower Fault Miswire Rack-Mounting the Router in a 19-Inch 4-Post Rack30012 Step Attaches the chassis to the rackRack-Mounting the Router in a 23-Inch 2-Post Rack Aution30014 30015 Attaching the Cable-Management Bracket Attaching the Cable-Management BracketAttaching Grounding Wire to Grounding Lug Attaching the Grounding LugInstalling Line Cards Suitable grounding is available. StatementConnecting Power Connecting DC Power to the Cisco 10008 RouterOr weld the metal object to the terminals. Statement Set the DC PEM switches to the Off position Removing the Safety Cover DC Power Connections Connecting AC Power to the Cisco 10008 Router Securing DC Power Cables to the ChassisSetting AC PEM Switches to the Off Position AC Power Cord Connectors in Strain-Relief Devices Connecting Cables Connecting Alarm IndicatorsRemoving the Safety Cover Alarm Indicator Terminal Block Connections Connecting a Video Terminal to the PRE Console Port Alarm Indicator Wires Exiting the Safety CoverConsole Port Connection on the PRE Connecting Network Management and Signal System Cables Ethernet Network Management Cable ConnectionsConnecting to a 100BASE-T Ethernet Network Correctly connected to the 100BASE-T Ethernet LAN Installing Network Cables to the Line Cards Auxiliary Modem ConnectionPowering On the System Power Fault MiswireConfiguring the Cisco 10008 Router at Startup Basic Configuration Using the Setup FacilityStartup Display Using the System Configuration Dialog Basic System Configuration ProcedureSpecify the IP address Basic Configuration in Global Configuration Mode Routerconfig # interface FastEthernet0/0/0Formatting Flash Disks and Flash Cards Router# format disk0Managing the File Systems File SystemsCLI Name Description Managing Configuration Files Larger than Nvram Compressing the Configuration FileRelocating the Configuration to a Flash Disk Exit global configuration mode Troubleshooting Installation Problems General Troubleshooting TipsSymptom Steps to Take Troubleshooting Ethernet Connections Switch configure terminalTroubleshooting the Console Port Serial Connection Page USA