1.Turn on power to the monitor and to all external devices.
2.Press and release the workstation Power button on the front panel (FIGURE
3.After several seconds, verify that the
The
If you experience problems during power on, see “Troubleshooting the Sun Blade 2500 Workstation” on page 35.
Tip – After you power on the workstation for the first time, you are ready to set up the preinstalled Solaris 8 2/04 and Solaris 9 9/04 Operating System software. Go to “Planning the Installation Process for Solaris” on page 11.
Powering Off the Workstation
TABLE 1-1 describes two methods for powering off the workstation.
TABLE 1-1 Powering Off the Workstation
Method | Instructions |
|
|
Method 1 | 1. Close and save any open applications. |
2.Press the Sleep key (or press and release the Power button).
3.Select Shutdown.
Method 2 | 1. | Close and save any open applications. |
| 2. | As superuser, type: shutdown |
|
|
|
Note – After powering off the workstation, always wait at least four seconds before powering on the workstation again.
Chapter 1 Setting Up the Sun Blade 2500 Workstation 9