METRObility Optical Systems RADIANCE 10/100MBPS ACCESS OPTICAL NETWORK UNIT Installation Guide

Page 12

three-conductor cord, a maximum of 15 feet in length and a parallel blade, grounding-type attachment plug rated 15A, 125V.

AC 230V (USA): use a UL-listed cord set consisting of a minimum No. 18 AWG, type SVT three-conductor cord, a maximum of 15 feet in length and a Tandem blade grounding- type attachment plug rated 15A, 250V.

240V (outside USA): use a cord set consisting of a minimum No. 18 AWG cord and grounding-type attachment plug rated 15A, 250V. The cord set should have the appropriate safety approvals for the country in which the unit is being installed and be marked HAR.

12 Installation Guide

Image 12
Contents Installation & User Guide Radiance Access Optical Network Unit 10/100Mbps Copper to FiberInstallation & User Guide Overview Radiance 10/100Mbps Access Optical Network Unit 2Set the Switches MDI-IIto MDI-XSwitch twisted-pair port only1Unpack the Unit Default Settings Duplex Link Loss Carry Forward 3Connect to the NetworkTwisted-Pair Interface 4Apply Power Installation Guide LED Indicators Factory SettingsDefault Hardware Switch Settings Default Software Settings Software SettingsLoopback Mode Port Enable/DisableRemote Management Statistics Rmon StatisticsEthernet Statistics Singlemode Fiber Optic Power Monitors Input Power LevelLink Loss Carry Forward Llcf Link Loss Return LLR Topology Solutions Technical Specifications Data RateNetwork Connections Power EnvironmentalProduct Safety, EMC and Compliance Statements CSAWarranty and Servicing Product Manuals