Barco R 9849999 installation manual

Page 14

4.Routing the Cables

a.RGBHV cable preparation: With the help of PVC tape arrange the connectors in series. Pass the Signal cables and Power cord into cable guide R826761

.

b.Pass the Signal cables into the IQ bar assembly from top side. Take out the BNC connector (in case of a 5 BNC cable) one by one from bottom side.

Image 14
Contents Installation Manual Ceiling Mount for CLM series projectorBarco n.v Safety guidelines Description and Contents of the kit Remark Llustration of the Cable Cover AssyNecessary Tools Centering the ceiling mountFixation can be done with standard M8 bolt not supplied Projector preparation Slide Lift Shift parallel to the screen Up down TiltRotate around Vertical axis ±5 Rotate around central Axis ±3 Rotate around central Vertical axis Rotate around central Horizontal axisMounting the bar with Cable Cover assembly Page Page Page RGB cables Power cord & other cables Cable Ties Rotate around R83578l