Barco R 9849999 installation manual Projector preparation

Page 8

Projector preparation

1.Turn the projector to its back and remove the Feet assembly. Unscrew 3 Plastic feet and remove their Allen head M10 screws. Discard 3 plastic feet r852944 and x head M10 screw.

R852944, R852945 & A566050 M10

SCREW, & FEET SUPPORT

2.Fix the Spacer M10 (r835785) as shown below. For alignment of the Centre distance between the spacers fix the ceiling mount and fix nut M8 B360623, Do not tight fully then tight the spacer M10. Remove the Ceiling mount and fix it on the Ceiling.

Washer , Spacer

M10 R835785 and

Flange Nut M8

Image 8
Contents Installation Manual Ceiling Mount for CLM series projectorBarco n.v Safety guidelines Description and Contents of the kit Remark Llustration of the Cable Cover AssyNecessary Tools Centering the ceiling mountFixation can be done with standard M8 bolt not supplied Projector preparation Slide Lift Shift parallel to the screen Up down TiltRotate around Vertical axis ±5 Rotate around central Axis ±3 Rotate around central Vertical axis Rotate around central Horizontal axisMounting the bar with Cable Cover assembly Page Page Page RGB cables Power cord & other cables Cable Ties Rotate around R83578l