Barco R 9849999 installation manual

Page 16

6.Hang on the IQ bar and cable routed assembly. Fix with 4 M8 bolt along with

washer M.

M

 

7.Mount the Ceiling mount assembly on to the horizontal shift plate by twisting and then lifting up. Fix the 2 M8 Bolt A.

A

8.Route the Power cord to the back and Signal cables to the front.

Image 16
Contents Installation Manual Ceiling Mount for CLM series projectorBarco n.v Safety guidelines Description and Contents of the kit Remark Llustration of the Cable Cover AssyNecessary Tools Centering the ceiling mountFixation can be done with standard M8 bolt not supplied Projector preparation Slide Lift Shift parallel to the screen Up down TiltRotate around Vertical axis ±5 Rotate around central Axis ±3 Rotate around central Vertical axis Rotate around central Horizontal axisMounting the bar with Cable Cover assembly Page Page Page RGB cables Power cord & other cables Cable Ties Rotate around R83578l