Barco R 9849999 installation manual Mounting the bar with Cable Cover assembly

Page 13

Mounting the bar with Cable Cover assembly

1.Unscrew the 2 bolts J and slide out the upper part of the Bar. Pass the cable cover into the upper part of the Bar

2.Slide the horizontal shift plate R 826743 into the lower part of the Bar. Fix with 4 M8 bolt K.

3.Slide the upper bar into the lower bar assembly. Remount the 2 previously removed bolt J. Adjust the height to minimum.

K

J

Image 13
Contents Ceiling Mount for CLM series projector Installation ManualBarco n.v Safety guidelines Description and Contents of the kit Llustration of the Cable Cover Assy RemarkCentering the ceiling mount Necessary ToolsFixation can be done with standard M8 bolt not supplied Projector preparation Slide Lift Up down Tilt Shift parallel to the screenRotate around Vertical axis ±5 Rotate around central Axis ±3 Rotate around central Horizontal axis Rotate around central Vertical axisMounting the bar with Cable Cover assembly Page Page Page RGB cables Power cord & other cables Cable Ties Rotate around R83578l