Barco R 9849999 installation manual Slide Lift

Page 9

3.Lift and slide the projector assembly into the Ceiling mount. The projector will be located precisely into the ceiling mount base plate after the tightening of 3 M 8 flange Nuts (b360623).

Slide

Lift

4.Route the Signal cables and Power cord into the cable saddles.

5.Take care of the orientation of safety chain bracket.

6.Fix the one end of safety chain into the projector’s chain bracket with the help of the snap hook and the other end to the firm place in the Ceiling.

Image 9
Contents Ceiling Mount for CLM series projector Installation ManualBarco n.v Safety guidelines Description and Contents of the kit Llustration of the Cable Cover Assy Remark Centering the ceiling mount Necessary ToolsFixation can be done with standard M8 bolt not supplied Projector preparation Slide Lift Up down Tilt Shift parallel to the screenRotate around Vertical axis ±5 Rotate around central Axis ±3 Rotate around central Horizontal axis Rotate around central Vertical axisMounting the bar with Cable Cover assembly Page Page Page RGB cables Power cord & other cables Cable Ties Rotate around R83578l