Barco R 9849999 installation manual

Page 15

c. Pass the Power cord and the other cables (if any) one by one.

d.Pass all the cables one by one from cable guide R 826745 and fix the cable guide on to the horizontal shift plate using 2 M3 Screws L.

L

The cable routing through IQ bar is complete. Adjust the approximate height of the IQ bar and also adjust the length of the cable required at the projector side.

5.Mount the Ceiling Bracket R 826748 on to the ceiling with standard M8 bolt not supplied with the Kit. For marking of the ceiling holes, refer the Installation manual of the Ceiling Mount of CV 120 (R5973715)

Image 15
Contents Ceiling Mount for CLM series projector Installation ManualBarco n.v Safety guidelines Description and Contents of the kit Llustration of the Cable Cover Assy RemarkCentering the ceiling mount Necessary ToolsFixation can be done with standard M8 bolt not supplied Projector preparation Slide Lift Up down Tilt Shift parallel to the screenRotate around Vertical axis ±5 Rotate around central Axis ±3 Rotate around central Horizontal axis Rotate around central Vertical axisMounting the bar with Cable Cover assembly Page Page Page RGB cables Power cord & other cables Cable Ties Rotate around R83578l