x600 Layer 3 Gigabit Ethernet Switch Installation Guide
2.Remove the transceiver from its shipping container and store the packaging material in a safe location.
3.Position the transceiver with the label facing up.
4.Slide the transceiver into the slot until it clicks into place. See Figure 41.
23R |
|
|
|
|
|
|
|
| CLASS 1 |
|
|
|
|
| |
| LASER | PRODUCT |
|
|
|
|
|
|
| L/A | 1000 | LI |
| PORT | AC |
|
| D/C | NK / | ||||
|
| FDX |
| ACT | |||
24R |
|
|
|
| |||
|
|
|
|
|
|
| |
| 21 |
|
|
|
|
|
|
| 22 |
|
|
|
|
| |
|
| 23 |
|
|
|
|
|
|
| 24 |
|
|
|
|
|
|
| 1331 |
|
|
|
|
|
Figure 41. Installing an SFP Transceiver
5.For the x600-24Ts and x600-24Ts/XP switches, verify that the handle on the SFP transceiver is in the upright position, as shown in Figure 42, to prevent inadvertently removing the transceiver.
23R |
|
|
|
|
|
|
| CLASS 1 |
|
|
|
| |
| LASER | PRODUCT |
|
|
|
|
|
| L/A | 1000 | LINK / | PORT | AC |
|
| D/C | ||||
|
| FDX | ACT | |||
24R |
|
|
| |||
|
|
|
|
|
| |
| 21 |
|
|
|
|
|
| 22 |
|
|
|
| |
|
| 23 |
|
|
|
|
|
| 24 |
|
|
|
|
|
| 1331 |
|
|
|
|
Figure 42. Positioning Handles on the x600-24Ts and x600-24Ts/XP
Switches
83