NETGEAR GS752TXS manual Installation

Page 20

4. Installation

4

 

This chapter describes the installation procedures for your GS752TXS Smart Switch. Switch installation involves the following steps:

Step 1: Preparing the Site

Step 2: Installing the Switch

Step 3: Checking the Installation

Step 4: Connecting Devices to the Switch

Step 5: Installing an SFP Transceiver Module

Step 6: Installing Device as Stand-alone or Stack Master

Step 7: Applying AC Power

Step 8: Managing the Switch using a Web Browser or the PC Utility

Chapter 4. Installation 20

Image 20
Contents GS752TXS Smart Switch Technical Support Table of Contents GS752TXS Smart Switch Hardware Installation Guide GS752TXS Smart Switch Hardware Installation Guide Contents Introduction Features OverviewStacking Package Contents GS752TXS Smart Switch Hardware Installation Guide Page GS752TXS Front-Panel and Back-Panel Configuration Physical DescriptionLED Designations Port LEDsSystem LEDs Following table describes the system LED designationsSFP+ Ports Device Hardware InterfacesRJ-45 Ports Reset Button Factory Defaults ButtonPage Desktop Switching ApplicationsBackbone Switching Backbone Switching ApplicationsInstallation Installing the Switch Installing the Switch on a Flat SurfaceInstalling the Switch in a Rack Preparing the SiteChecking the Installation Connecting Devices to the SwitchInstalling an SFP Transceiver Module Connecting Devices to the SwitchInstalling Device as Stand-alone or Stack Master Installing and SFP Transceiver ModuleApplying AC Power Stacking TopologiesManaging the Switch using a Web Browser or the PC Utility Troubleshooting Troubleshooting ChartAdditional Troubleshooting Suggestions ConfigurationSwitch Integrity Network Adapter CardsTechnical Specifications Interface Physical Specifications Page Netgear Wired Products Notification of ComplianceEuropean Union Index Index