Liebert ITR installation manual Materials Supplied

Page 27

Air-Cooled Models

3.5.2Materials Supplied

1.Built-in pre-wired condenser control box

2.Air-cooled condenser

3.Piping access cover to be reinstalled when piping is complete

4.Bolts (four per leg) 3/8" x 5/8"

5.Terminal block for two-wire 24V interlock connection between the unit and the condenser

6.Condenser legs: four on one-fan models

7.Lee-Temp system:

a.Insulated storage receiver

b.Head pressure control valve with integral check valve

c.Adapter assembly

d.Rotalock valve

e.Pressure relief valve

f.Liquid level sight glass

g.Check valve

8.Bolts - (six per receiver) 3/8" x 1"

NOTE

Lee-Temp heater pad requires a separate, continuous electrical source of either 115 VAC or 200/208/230 VAC.

3.5.3Dehydration/Leak Test and Charging Procedures for R22 (Standard) or R407C (Optional) Lee-Temp Control Type Condenser

! CAUTION

All local codes for handling refrigerant must be followed.

NOTE

As R22 and R407C are similar in properties, proper safety equipment and proper refrigeration tools are required on both types. Check unit nameplate for correct refrigerant type and oil type before topping off or recharging a system.

NOTE

Refrigerant R407C uses a POE (polyol ester) lubricant. The R407C refrigerant must be introduced and charged from the cylinder only as a liquid.

NOTE

When installing field piping, care must be taken to protect all refrigerant lines from the atmosphere, especially when using refrigerants with POE oils. Do not allow the piping to stand open to air for more than 15 minutes. Units designed for R407C have a compressor which contains POE oil that is very hygroscopic; that is, it quickly absorbs water from the air. The longer the compressor piping is left open to air, the harder it will be to fully evacuate. If left open too long, the POE oil may need to be replaced before achieving the required vacuum level.

21

Image 27
Contents Liebert Challenger ITR Page Table of Contents Chilled Water Models Split System ModelsR407C Refrigerant Figures Tables System Descriptions Location Considerations Remote Sensor Installation LocationRoom Preparation Equipment InspectionDomestic Export Model Lb kg 50Hz Models 60Hz Models Unit shipping weightsHandling With Skid Removal of SkidUnit Weight Cabinet dimensionsSL-11897 Piping Considerations Drain LinePiping connection size Piping Outlet Locations Piping connections for split system fan coil units Piping connections for water/glycol and Glycool units Piping connections for chilled water self-contained units Electrical connections Electrical ConnectionsPlenum Installation Balancing the Air DistributionDucted Applications Checklist for Completed Installation Lee-Temp/Flood Back Head Pressure Control Condensers Condenser LocationLine Voltage Low VoltageAir-cooled condenser statistics Equivalent Length Hot Gas Line Liquid Line Refrigerant PipingRecommended line sizes OD copper inches 23 & 33 kW 067A 065ACondenser refrigerant per serial tag Fan Speed Control SystemsMaterials Supplied Equivalent lengths feet for various pipe fittingsDehydration/Leak Test Single Circuit Shown Piping Refrigerant control settings psi kPaLee-Temp/Flood Back Head Pressure Control Systems ChargingMaterials Supplied Low Pressure Cut Out High Pressure Cut Out 360 Single Circuit Shown Condenser Water-cooled general arrangement Water Regulating Valve Manual Flushing Water Regulating Valve AdjustmentTesting Valve Function Water Regulating ValveDrycooler Installation Drycooler LocationPump and Drycooler Dry Bulb Wet Bulb Relative Dew Point Humidity Room dew point temperaturesGlycol Piping Expansion Tanks, Fluid Relief Valves and Other DevicesPreparing the System for Filling Indoor unit glycol volume approximate gallons liters maxVolume in standard Type L copper piping Filling InstructionsGlycol Solutions Ethylene glycol concentrations@ 50F 10C Filling the System 483mm 43-3/16 1097mm For expansion tank dimensions, see on43-9/16 110 5mm See Note 30-1/4Pump Pump Suction Pump Discharge Connection Mounting hole dimensional dataDrycooler data Glycol pump dataGlycol general arrangement Glycool general arrangement Glycol Regulating Valve Glycol Regulating Valve AdjustmentChilled Water Models Water/Glycol-Cooled Condensing Units Air-Cooled Condensing UnitsRefrigerant Loop Unit refrigerant charge Recommended refrigerant lines R22 or R407C sizes OD copperLine coupling sizes Evaporator Condensing Unit EvaporatorQuick Connect Fittings Outdoor Air-Cooled Condensing Units Unit Dimensions See TablePFH067A-L See Table Outdoor air-cooled condensing unit-top air discharge modelsPiping and electrical connections top air discharge 36-1/4 38-1/2152 SL-11081 PG 8A Electrical field connections, prop fan condensing moduleIndoor centrifugal condensing unit Installing the Indoor Condensing UnitModel Net Weight 60 Hz 50 Hz Lb kg MC65A MC64A Centrifugal Air-Cooled Condensing UnitsAirflow CFM CMH DuctingCentrifugal air-cooled condensing unit dimensional data AIR Cooled Water Cooled Condenser Water Requirements Regulating Valve Adjustment and TestingWater and Glycol-Cooled Condensing Units Piping ConsiderationsWater/glycol-cooled condensing unit dimensions WATER/GLYCOL R407C Refrigerant Temperature Gauge Pressure Psig KPaTemperature Pressure Gauge Psig KPa Calculating SubcoolingExample That Ne tIti Ti n

ITR specifications

The Liebert ITR is an advanced precision cooling unit designed to maintain optimal temperature and humidity levels in mission-critical environments. Engineered for high-performance applications, it is particularly suitable for data centers, telecommunications facilities, and other spaces that require precise climate control to ensure uninterrupted operation of sensitive equipment.

One of the main features of the Liebert ITR is its modular design. This allows for scalability and flexibility, enabling users to customize the system based on their specific cooling needs. The unit can be configured in various sizes and cooling capacities, making it suitable for both small server rooms and large data centers. This adaptability is crucial for organizations that anticipate growth and require an efficient cooling solution that can evolve with their infrastructure.

The Liebert ITR incorporates state-of-the-art technologies to enhance performance and energy efficiency. Among these technologies is the use of a variable speed compressor that adjusts its speed based on the cooling load. This capability not only improves energy efficiency but also significantly reduces operational costs by minimizing electricity consumption when cooling demands fluctuate.

Additionally, the unit features advanced control systems that provide intelligent monitoring and management of temperature and humidity levels. These systems can integrate seamlessly with building management systems (BMS) and can be operated remotely, providing users with real-time insights into the performance of the cooling system. Such connectivity ensures quick identification and resolution of potential issues, thereby reducing downtime and maintaining optimal conditions for critical equipment.

The Liebert ITR utilizes eco-friendly refrigerants, contributing to reduced environmental impact while ensuring compliance with regulatory standards. The unit's design also emphasizes reliability, featuring robust construction and redundant components that enhance longevity and minimize the likelihood of failures.

Furthermore, the Liebert ITR is equipped with advanced filtration systems that maintain air quality by reducing particulate matter and contaminants, ensuring that the atmosphere within data centers is not only cool but also clean—critical for the longevity of sensitive electronic equipment.

Overall, the Liebert ITR is characterized by its innovative design, energy-efficient operation, and comprehensive control capabilities, making it an ideal choice for businesses looking to safeguard their critical infrastructure from overheating and humidity. As climate control becomes increasingly important in the digital age, the Liebert ITR stands out as a reliable solution for maintaining optimal environmental conditions.