Liebert 110V manual Potential free contacts

Page 16

Chapter 1 - General Description

User Manual

Network Power Switch

1.6 Potential free contacts

The Network Power Switch status can be checked with the 37-pin D-type connector, located on the rear end. This is a potential free contact, and gives following indications as shown in Table 1-1

Table 1-1

Status

 

Termination available of 37 pin D-type connector

 

 

 

 

 

 

 

 

 

 

 

NC

 

NO

Common

NC

NO

Common

 

 

 

 

 

 

 

 

Overload

20

 

1

2

3

21

19

 

 

 

 

 

 

 

 

Priority

23

 

4

5

6

24

19

 

 

 

 

 

 

 

 

 

S1

Feed

7

 

25

26

27

8

19

 

 

 

 

 

 

 

 

 

S1

Healthy

28

 

9

10

11

29

19

 

 

 

 

 

 

 

 

 

S2

Healthy

12

 

30

31

32

13

19

 

 

 

 

 

 

 

 

 

S2

Feed

33

 

14

15

16

34

19

 

 

 

 

 

 

 

 

Unsynch

17

 

35

36

37

18

19

 

 

 

 

 

 

 

 

 

The pin details for this connector is shown in fig 1.6

Two potential free contacts indicating Source 1 and Source 2 Healthy conditions are taken from this 37 pin D type connector and terminated at rear terminal connectors, as shown in figure 1.7.

19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

 

 

 

Pin Details

37 36 35 34 33

32 31 30

29 28 27 26 25 24 23 22 21 20

50

– S2 Healthy

 

 

 

51

– S1 Healthy

 

 

 

52

- Common

52

50

51

 

 

Fig 1.6 – Pin details for 37 pin D-type Connector

52 50 51

S1 Healthy

S2 Healthy

Common

I/p Line - 1

I/p Line - 2

Neutral - 1

Neutral - 2

O/p Line

POTENTIAL

FREE CONTACTS

Input Fuse 2

Input Fuse 1

Rear View

Fig 1.7 – Potential free contacts Connectors

Page 1-6

Image 16
Contents Network Power Switch Emerson Network Power Dear CustomerEnglish Page Registered Head Office Branch Offices Conformity and Standards Table of Contents This manual describes the following equipment Equipment Part NumberPage General description IntroductionDesign Concept Mechanical Design Description Mimic Indications LED IndicationManual Bypass Switch Operation Manual Bypass Switch OperationPotential free contacts Operating Instructions General NotesSwitching the Load to Manual Bypass condition Switch to Yellow LED ‘ON’ Position onlyInstallation Procedure Equipment positioning and environmental considerationsConnecting cables to Network Power Switch Cable entryCable connections Network Power Switch General Specifications SpecificationsElectrical Specifications Mechanical specifications Environmental specificationsNetwork Power Switch Page4-3 Page Installation Drawings Power Circuit Diagram External Power Cable Connections 431 mm Network Power Switch 02/04