Liebert 110V manual Installation Procedure, Equipment positioning and environmental considerations

Page 19

User Manual

Chapter 3 – Installation Procedure

Network Power Switch

3 Chapter 3 – Installation Procedure

3.1 Introduction

WARNING

Do not apply electrical power to the Network Power Switch equipment before the arrival of the

commissioning engineer.

WARNING

The Network Power Switch equipment should be installed by a qualified engineer in accordance with the

information contained in this chapter and the drawing package shipped inside UPS cabinet.

This chapter contains information regarding the positioning and cabling of the Network Power Switch.

Because every site has its peculiarities, it is not the aim of this chapter to provide step-by-step installation instructions, but to act as a guide to the general procedures and practices that should be observed by the installing engineer.

3.2 Equipment positioning and environmental considerations

The Network Power Switch cabinets are designed to fit in standard 19-inch rack. In case of non-availability, it can be kept on floor or as a tabletop item, with sufficient ground clearance.

The super switch module should be located in a cool, dry, clean environment with adequate ventilation to keep the ambient temperature within the specified operating range.

WARNING

The Network Power Switch cabinet is connected with live voltages,

hence it should be located at safe place.

Before Installing, the ‘Transit Clamps’ are to be removed as shown in the figure 3.1. Without removing the clamps, the Hotswap unit cannot be opened.

Fig 3.1 – Removal of Transit Clamps

Page3-1

Image 19
Contents Network Power Switch Dear Customer Emerson Network PowerEnglish Page Registered Head Office Branch Offices Conformity and Standards Table of Contents Equipment Part Number This manual describes the following equipmentPage Introduction General descriptionDesign Concept Mechanical Design Description LED Indication Mimic IndicationsManual Bypass Switch Operation Manual Bypass Switch OperationPotential free contacts General Notes Operating InstructionsSwitch to Yellow LED ‘ON’ Position only Switching the Load to Manual Bypass conditionEquipment positioning and environmental considerations Installation ProcedureCable entry Connecting cables to Network Power SwitchCable connections Network Power Switch General Specifications SpecificationsElectrical Specifications Environmental specifications Mechanical specificationsNetwork Power Switch Page4-3 Page Installation Drawings Power Circuit Diagram External Power Cable Connections 431 mm Network Power Switch 02/04