IMC Networks E1, IE-IMCV-T1 operation manual Table of Contents

Page 3

Table of Contents

FCC Radio Frequency Interference Statement

....................................................ii

Warranty

ii

About the IE-iMcV-T1/E1/J1-LineTerm

1

Installing an iMcV-Module

2

Crossover/Straight-Through Connection

2

Configuration

2

Prerequisites

2

Managed Modules

3

Configuration Control

4

Unmanaged Modules

5

DIP Switches

6

DIP Switch Settings (S2, S3)

7

Features

9

LED Operation

13

Loopback Testing

14

Pseudorandom Bit Sequence (PRBS) Testing

15

Installation Troubleshooting

15

Specifications

17

IMC Networks Technical Support

17

Fiber Optic Cleaning Guidelines

18

Electrostatic Discharge Precautions

19

Certifications

20

iii

Image 3
Contents IE-iMcV-T1/E1/J1-LineTerm SFP FCC Radio Frequency Interference Statement WarrantyTable of Contents IE-iMcV-T1/E1/J1-LineTerm in this manual About the IE-iMcV-T1/E1/J1-LineTerm, TP/SFPPage Managed Modules Configuration Control Unmanaged Modules IView² Management SoftwareDIP Switches Switch Settings for Switch S2 DIP Switch Settings S2, S3Switch Settings for Switch S3 SFP FeaturesLoopback Loopback ModesFault Loopback Transmit LIU Waveshape and Gain Line Build-OutTransmit Data Source Remote Management T1, E1 and J1 SelectionCopper Port LEDs LED OperationLoopback Testing Installation Troubleshooting General Troubleshooting Pseudorandom Bit Sequence Prbs TestingPin Signal IMC Networks Technical Support SpecificationsFiber Optic Cleaning Guidelines Electrostatic Discharge Precautions Certifications Document Number 50-80104-00 A1