Magnum 6K25 Managed Fiber Switch | Installation and User Guide (04/06) |
2.2.3Eight-Port Copper Module, 6K8-RJ45 The 6K25-Series’s 8-port
Copper port module, model | 10/100 |
|
| 1 |
|
| 3 |
|
| 5 |
|
| 7 |
|
|
| LK | |||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
10/100Mb switched |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ACT | |
F/ H |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||||
ports. The 10/100Mb switched | 10/100 |
|
| 2 |
|
|
| 4 |
|
| 6 |
|
| 8 |
|
| LK | |||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||||
ports normally (as a default | F/H |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||
setting) are independently N- |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ACT | |||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
way
crossover(MDIX) for operation at 10 or 100Mb speed in full- or
(See Section 4.3 for
On the model | |||||||
connector and two separate. The LK (Link) LED indicates “ready for operation” on that | |||||||
port when lit. The blinking ACT (Activity) LED indicates receiving Activity on that port | |||||||
when lit. The 10/100 LED indicates operation at 100Mb speed when ON and at 10 Mb | |||||||
speed when OFF (when auto- |
| 1 | 3 | 5 | 7 |
| |
negotiation is not disabled). |
|
| |||||
10/100 |
|
|
|
| LK | ||
|
|
|
|
| |||
The FDX/HDX LED is ON |
|
|
|
|
| ACT | |
to indicate | F/ H | 2 | 4 | 6 | 8 | ||
| |||||||
operation and OFF to indicate | 10/100 |
|
|
|
| LK | |
|
|
|
|
| |||
F/H |
|
|
|
| ACT | ||
|
|
|
|
|
pair cable must be connected
into an
Using the
www . GarrettCom . com
11