GE 70R-1000D manual MX150 User Setup SET Menu, Change adjustable values through the SET menu

Page 18

MX150 User Setup - SET Menu

 

S1

OK

01: 50

 

FRI 31 MAY 2003

MORE

TEST

 

 

 

 

 

1 VAB = ___

2 VAB = ___

VBC = ___

 

VCA = ___

 

MORE CFG

SET ESC

Change adjustable values through the SET menu.

Enter six digit access code

(The factory assigned six-digit access code is located on the back of the controller)

S E T

USER SETUP

41

52

63

Engine Start Relay (De-Energized)

Network Communications (Option)

WARNING

1Controller Inputs must be relay Isolated.

A2

A1

RELAY

14

11

12

(-)

(+)

 

 

 

 

 

 

 

 

 

COM

MOREBACK

Customer

J2-3

J2

*

1

PROG 1

2

PROG 2

3GRD (Input

InputN.O N.C Voltage

To

J2/J4

Inputs

4

Sink)

5

6

7

8

9

NIA OUT

ELEV. PRE. OUT

ALARM OUT

2Controller Outputs have "Limited" Source Capacity. Use only GE Zenith-specified Output Modules.

11

14

12

 

A1

 

(+)

 

 

 

R1

21

24

22

 

A2

 

(-)

 

 

 

 

10

11

12

13

14

15

16

MOTOR DISC. OUT

INHIB.>S1

INHIB.>S2

Output

 

 

 

 

 

Contacts

 

 

 

 

 

11

14

12

21

24

22

 

R1 Output

 

 

R1 Output

 

Optional Accessories

*

Contact Rating: 10A @ 250 VAC or 30 VDC

J4

*1

2

3+12v (Output Source)

4LN OUT

5L4 OUT

6

L3 OUT

Lithium Battery

Exerciser Battery

 

7

L2 OUT

 

Replacement-K-4100 (BR2032)

8

L1 OUT

 

Service Life-10 Years

 

During normal operation

9

YN IN

 

 

10

YE IN

User Access Code

Default-121212

11

TSNL IN

 

 

12

Q2/TSL IN

PRODUCT INFORMATION

www.geindustrial.com

13

S12 IN

24-Hour Service

(773)299-6600

14

 

 

 

 

MX150

Figure 9

18

ZTG/ZTGD Operation and Maintenance Manual (70R-1000D)

GE Zenith Controls

Image 18
Contents GE Zenith Controls Authorized Service Table of ContentsIntroduction Final Equipment Inspection Safety / InstallationEquipment Inspection and Storage MountingInstallation cont’d Power ConnectionsEngine Start Control Connections Installation cont’d GE Zenith Controls Initial EnergizationInitial Energization cont’d R E T E S TMX150 Microprocessor Controller MX150 ControllerMX150 Microprocessor Controller cont’d LCD & KeypadSource User Setting for Voltage & FrequencyStandard Features, Mstdg Option Pkg CalibrateStd. Features, Mstdg Option Pkg. cont’d R50S13 Standard Features, Mexeg Option Pkg CDP replaces CDTOptional Accessories How to Set the System Clock CDT One Event Timer ExerciserCDT One Event Timer Exerciser cont’d How to Bypass Cancel an exercise during an exercise cycleCDP Clock Exerciser Load / No-Load Clock ExerciserMX150 User Setup CFG Menu Turn options on or OFF via keypad through the CFG menuMX150 User Setup SET Menu Change adjustable values through the SET menuMX150 User Setup System Info View System DataDelayed Transition TestingATS Testing Standard TransitionTimer Designations as they appear in the SET menu Sequence of OperationControls Power Supply CPS Standard and Delay TransitionControls Power Supply CPS cont’d Standard Transition CPS SchematicDelayed Transition CPS Schematic Troubleshooting and Diagnostics General TroubleshootingTesting Maintenance and TestingInspection and Cleaning ServicingPower Panel and Replacement Parts Standard Transition 40 to 260 Amps Solenoid TypePower Panel and Replacement Parts cont’d Standard Transition 400 to 600 Amps Molded TypeStandard Transition 800 to 1200 Amps ARC Grid Removed for ClarityStandard Transition 1600 to 3000 Amps Stationary Contact Moveable ContactDelayed Transition 40 to 600 Amps AmpsDelayed Transition 800 to 1200 Amps SCR-EO Movable Contact Stationary ContactDelayed Transition 1600 to 3000 Amps Movable E3 Contact StationaryPage Page Page GE Zenith Controls