GE 70R-1000D MX150 User Setup CFG Menu, Turn options on or OFF via keypad through the CFG menu

Page 17

MX150 User Setup - CFG Menu

S1

OK

01: 50

FRI 31 MAY 2003

MORE

TEST

Turn options ON or OFF via keypad through the CFG menu

Enter six digit access code

(The factory assigned six-digit access code is located on the back of the controller)

1 VAB = ___

2 VAB = ___

VBC = ___

 

VCA = ___

 

MORE CFG

SET ESC

41

52

63

Engine Start Relay (De-Energized)

Network Communications (Option)

WARNING

1Controller Inputs must be relay Isolated.

A2

A1

RELAY

14

11

12

(-)

(+)

 

 

 

 

 

 

 

 

 

COM

Customer

J2-3

J2

*

1

PROG 1

2

PROG 2

3GRD (Input

InputN.O N.C Voltage

To

J2/J4

Inputs

4

Sink)

C O N F I G

USER SETUP

5

6

7

8

9

NIA OUT

ELEV. PRE. OUT

ALARM OUT

2Controller Outputs have "Limited" Source Capacity. Use only GE Zenith-specified Output Modules.

11

14

12

 

A1

 

(+)

 

 

 

R1

21

24

22

 

A2

 

(-)

 

 

 

 

MOREBACK

10

11

12

13

14

15

16

MOTOR DISC. OUT

INHIB.>S1

INHIB.>S2

Output

 

 

 

 

 

Contacts

 

 

 

 

 

11

14

12

21

24

22

 

R1 Output

 

 

R1 Output

 

 

 

 

 

 

*

Contact Rating: 10A @ 250 VAC or 30 VDC

J4

*1

2

3+12v (Output Source)

4LN OUT

5L4 OUT

6

L3 OUT

Lithium Battery

Exerciser Battery

 

7

L2 OUT

 

Replacement-K-4100 (BR2032)

8

L1 OUT

 

Service Life-10 Years

 

During normal operation

9

YN IN

 

 

10

YE IN

User Access Code

Default-121212

11

TSNL IN

 

 

12

Q2/TSL IN

PRODUCT INFORMATION

www.geindustrial.com

13

S12 IN

24-Hour Service

(773)299-6600

14

 

 

 

 

MX150

Figure 9

Optional Accessories

GE Zenith Controls

ZTG/ZTGD Operation and Maintenance Manual (70R-1000D)

17

Image 17
Contents GE Zenith Controls Introduction Authorized ServiceTable of Contents Equipment Inspection and Storage Safety / InstallationFinal Equipment Inspection MountingEngine Start Control Connections Installation cont’dPower Connections Installation cont’d Initial Energization GE Zenith ControlsR E T E S T Initial Energization cont’dMX150 Controller MX150 Microprocessor ControllerLCD & Keypad MX150 Microprocessor Controller cont’dStandard Features, Mstdg Option Pkg User Setting for Voltage & FrequencySource CalibrateS13 Std. Features, Mstdg Option Pkg. cont’dR50 CDP replaces CDT Standard Features, Mexeg Option PkgOptional Accessories CDT One Event Timer Exerciser How to Set the System ClockHow to Bypass Cancel an exercise during an exercise cycle CDT One Event Timer Exerciser cont’dLoad / No-Load Clock Exerciser CDP Clock ExerciserTurn options on or OFF via keypad through the CFG menu MX150 User Setup CFG MenuChange adjustable values through the SET menu MX150 User Setup SET MenuView System Data MX150 User Setup System InfoATS Testing TestingDelayed Transition Standard TransitionSequence of Operation Timer Designations as they appear in the SET menuStandard and Delay Transition Controls Power Supply CPSDelayed Transition CPS Schematic Controls Power Supply CPS cont’dStandard Transition CPS Schematic General Troubleshooting Troubleshooting and DiagnosticsInspection and Cleaning Maintenance and TestingTesting ServicingStandard Transition 40 to 260 Amps Solenoid Type Power Panel and Replacement PartsStandard Transition 400 to 600 Amps Molded Type Power Panel and Replacement Parts cont’dARC Grid Removed for Clarity Standard Transition 800 to 1200 AmpsStationary Contact Moveable Contact Standard Transition 1600 to 3000 AmpsAmps Delayed Transition 40 to 600 AmpsSCR-EO Movable Contact Stationary Contact Delayed Transition 800 to 1200 AmpsMovable E3 Contact Stationary Delayed Transition 1600 to 3000 AmpsPage Page Page GE Zenith Controls