GE 70R-1000D manual Installation cont’d

Page 5

Installation (cont’d)

DANGER

HAZARDOUS VOLTAGE

(Can Cause Severe Injury or Death)

Turn OFF all power before installation, adjustment, or removal of transfer switch or any of its components.

Control Connections

Figure 2

Engine Start

Connections

Input/Output Connectors to I/O Modules

To Power

Panel

Clock Program

Backup Battery

Remove protective strip to enable clock functions

Network Connector

To R/T Box

A complete information package is furnished with each transfer switch including a complete connection diagram and schematic which details all necessary control circuit field connections.

The engine start control wires connect to the engine start relay terminals located to the left

of the microprocessor. Figure 2 shows the location of these terminals.

The terminals are clearly identified by a label on the microcontroller backplate. In the case of manual trans- fer switches, or in other applications not requiring the microprocessor, clearly marked terminal blocks are provided in the upper left corner of the control panel for the engine start control wires.

GE Zenith Controls

ZTG/ZTGD Operation and Maintenance Manual (70R-1000D)

5

Image 5
Contents GE Zenith Controls Introduction Authorized ServiceTable of Contents Equipment Inspection and Storage Safety / InstallationFinal Equipment Inspection MountingEngine Start Control Connections Installation cont’dPower Connections Installation cont’d Initial Energization GE Zenith ControlsR E T E S T Initial Energization cont’dMX150 Controller MX150 Microprocessor ControllerLCD & Keypad MX150 Microprocessor Controller cont’dStandard Features, Mstdg Option Pkg User Setting for Voltage & FrequencySource CalibrateS13 Std. Features, Mstdg Option Pkg. cont’dR50 CDP replaces CDT Standard Features, Mexeg Option PkgOptional Accessories CDT One Event Timer Exerciser How to Set the System ClockHow to Bypass Cancel an exercise during an exercise cycle CDT One Event Timer Exerciser cont’dLoad / No-Load Clock Exerciser CDP Clock ExerciserTurn options on or OFF via keypad through the CFG menu MX150 User Setup CFG MenuChange adjustable values through the SET menu MX150 User Setup SET MenuView System Data MX150 User Setup System InfoATS Testing TestingDelayed Transition Standard TransitionSequence of Operation Timer Designations as they appear in the SET menuStandard and Delay Transition Controls Power Supply CPSDelayed Transition CPS Schematic Controls Power Supply CPS cont’dStandard Transition CPS Schematic General Troubleshooting Troubleshooting and DiagnosticsInspection and Cleaning Maintenance and TestingTesting ServicingStandard Transition 40 to 260 Amps Solenoid Type Power Panel and Replacement PartsStandard Transition 400 to 600 Amps Molded Type Power Panel and Replacement Parts cont’dARC Grid Removed for Clarity Standard Transition 800 to 1200 AmpsStationary Contact Moveable Contact Standard Transition 1600 to 3000 AmpsAmps Delayed Transition 40 to 600 AmpsSCR-EO Movable Contact Stationary Contact Delayed Transition 800 to 1200 AmpsMovable E3 Contact Stationary Delayed Transition 1600 to 3000 AmpsPage Page Page GE Zenith Controls