GE IC5008, IC5002, BC5005, IC5005, BC5008, BC5002 System Operation, Initial Startup Procedure

Page 27

Chapter

5

System Operation

This chapter covers the following topics:

Initial startup procedure

System startup for Windows NT

System startup for Windows 2000

Login

Installing Application Software

Image Recovery

Shutting Down the Computer

Initial Startup Procedure

Warning

Installation of the Intelligence Panel in hazardous locations requires the use of a cable mounting clamp with the power connector. For instructions for installing this clamp, refer to “Hazardous Locations Installation” in Chapter 3.

1.Plug the power cable into the unit’s power connector and connect to the power source.

2.Plug in the serial/parallel data transfer cables and screw the plugs to the connectors.

Caution

To prevent damage, do not attempt to connect leads unless the unit is switched off.

Note: The data cable shield must be connected to the housing of the push-on connector (EMC).

3.Switch on the unit and check whether any concealed damage has been caused by incorrect transportation, incorrect operating/storage conditions or incorrect handling (e.g. smoke coming out of the unit, etc.). If you notice any damage, switch off the unit immediately and secure it against unintentional use.

GFK-2023C

5-1

Image 27
Contents GE Fanuc Automation As Used in this Publication Preface Page Contents Contents IC5002/BC5000 Installation Diagram Viii GFK-2023C Chapter Key FeaturesCimplicity Machine Edition ME Bundle Bundled SolutionsGFK-2023C Product Features Technical Support Standard FeaturesContents of the Intelligence Panel PC Package Installation Site Safety InstructionsWarranty and Repairs Damage Resulting from Inappropriate UseTransportation Damage Installation Critical Dimensions for Installation Installation ProceduresView from back side IC5005/BC5005 Installation Diagram IC5008/BC5008 Installation Diagram Power Cable Installation Instructions Hazardous Locations InstallationVoc Vmax Isc Imax Avoiding Electrostatic Discharges Installing Additional ModulesSlot Cover Plates Installing Expansion CardsReserving IRQs for ISA Cards in the Bios Configuring Expansion Cards Legacy ISA OnlyIntelligence Panel I/O Port Range Table System Operation Initial Startup ProcedureSystem Startup for Windows NT Units System Startup for Windows 2000 Units Shutting Down the Computer Login RecommendationInstalling Application Software Touchscreen CalibrationImage Recovery Control Keys External Keyboard SoftkeyboardFront Panel LEDs Cimplicity ME Template for Hardware MonitoringTouchScreen CD-ROM Drive MouseHard Disk Floppy Disk DriveFront USB Port, All Units PortsNetworking Power Supply Connecting an External MonitorNetwork Adapter Driver Installation Driver InstallationRemove the CD-ROM from the drive Graphics Driver InstallationTouchScreen Driver Installation Softkeyboard Driver Installation Udma Driver InstallationRead/Write CD-ROM Utilities Regional SettingsIndustrial PC Monitor SystemStandards DimensionsEnvironmental Specifications Expansion CardsPin Assignments Port ConfigurationsLPT1 Parallel Port 25-pin D-Sub socket Bios Settings Unit TroubleshootingTouchscreen Troubleshooting Index Index