ICP DAS USA MSM-508FCS, MSM-508FT user manual Email Alarm, Alarm Event setting

Page 18

Industrial Ethernet Layer 2 Managed Switch – Web Management Manual

6.Email Alarm

ICPDAS Managed Switch can notify you by email when the specified event occurred. This chapter will guide you how to setting the related parameters.

￿Alarm Event setting

User can specify system and port events that warning emails will be sent.

Power1 ON

The status of power1 from OFF turns to ON.

Power2 ON

The status of power2 from OFF turns to ON.

Power1 OFF

The status of power1 from ON turns to OFF.

Power2 OFF

The status of power2 from ON turns to OFF.

System Relay ON

System relay activate.

System Relay OFF

System relay

System software Reboot

User reboots the Switch equipment through Switch

 

Management tool or the console command.

Link Lose

Port disconnected, such as, no cable connected; cable

 

break; opposing device fail.

Communication Lose

Port of the ring pair disconnected

April 29, 2008

15

Image 18
Contents Industrial Managed Ethernet Switch Contents Authentication Managed Switch Web Management Operation Web Connection StepApril 29 Basic Setting InformationNetwork IP Address:Gateway: MAC Address: Serial PortMask: Modbus Net IDDigital Input / Output Redundant Setting Redundant SettingRecovery Time Setting Recovery Time Cyber-Ring Protocol:Hello Time STP Protocol: Forward Time STP Protocol: Maxage Time STP Protocol:Egress Port configurationMirror Egress & IngressTrunking Port StatusSpeed Cable CheckingPort DuplexRelay Alarm Relay OutputEmail Alarm Alarm Event settingEmail Setting ReceiverEmail Record 802.1Q Secure Mode Vlan Mode802.1Q Check Mode Port Based VlanPort based VLANs 802.1Q VLANsEgress Policy QoS QoS Mode2,1 Weight Fair queuing scheme Strict priority schemeIP ToS/DiffServ Default PriorityTag Priority 802.1p Tag over Tos/DiffServPing AuthenticationDiagnosis AccountAccessible IP Network Setting Default SettingReboot Setting Serial Port Setting