Chapter 2
Installation and Setup
This chapter provides the following information for the
•
•
•
•
Site requirements and prerequisites
Package contents
Instructions for mechanical installation
Instructions for electrical installation.
After installing the unit, refer to Chapter 3 to assure normal operation.
In case a problem encountered, refer to Chapter 4 for test and diagnostic instructions.
Refer to Chapter 5 for additional information on the
| 2.1 Site Requirements and Prerequisites |
Power | |
| easily accessible grounded AC outlet. The outlet should furnish 115 VAC or |
| 230 VAC. |
•Allow at least 90 cm (36 in) of clearance at the front for operating and maintenance accessibility.
•Allow at least 10 cm (4 in) clearance at the rear of the unit for signal lines and interface cables.
Ambient | The ambient operating temperature of |
Requirements | at relative humidity of 90%, |
Site Requirements and Prerequisites