Cisco Systems UCS 5100, UCS 5108, N20C6508UPG manual Fabric Interconnect B Rear Port

Page 21

Installation

Proper FEX and Fabric Interconnect Port Connectivity

The following figure shows an invalid connection from a FEX to two separate fabric interconnects.

Figure 15: Invalid Connection for the Server Chassis and two Cisco UCS 6120XP Fabric Interconnects

Fabric Interconnect A Rear

1

3

5

 

7

9

11

13

15

17

19

21

23

25

27

29

31

 

1

3

5

7

9

11

13

15

 

2

4

6

 

8

10

12

14

16

18

20

22

24

26

28

30

32

 

2

4

6

8

10

12

14

16

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fabric Interconnect B Rear

 

 

 

1

3

5

7

9

11

13

15

17

19

21

23

25

27

29

31

 

1

3

5

7

9

11

13

15

 

 

2

4

6

8

10

12

14

16

18

20

22

24

26

28

30

32

 

2

4

6

8

10

12

14

16

 

 

 

 

 

 

 

Port 1

 

 

 

 

 

 

Port 1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Port 2

 

 

 

 

 

 

Port 2

 

 

 

 

 

 

 

 

 

 

 

 

 

Port 3

 

 

 

 

 

Port 3

 

 

 

 

 

 

 

 

 

 

 

Port 4

 

 

 

 

 

Port 4

 

 

 

 

 

 

 

 

I/O Module

Slot 1

 

I/O

Module

Slot 2

 

 

 

 

 

 

 

 

 

 

Chassis 1 rear

192748

Both fabric interconnects should be wired identically: if port 1 on FEX 1 for a chassis goes to FI-A port 5, then port 1 on FEX 2 goes to FI-B port 5.

The following figure shows valid connections from FEXes in two chassis to two separate fabric interconnects. When you connect the server chassis to the fabric interconnect do not connect the FEXes to the fabric interconnect's expansion modules. While similar in appearance to the other

Cisco UCS 5108 Server Chassis Installation Guide

OL-20035-05

21

Image 21
Contents This chapter contains the following sections Following notes and warnings apply to all installation tasksCable Management Rack RequirementsBefore Airflow ConsiderationsMoving Server Chassis Installation GuidelinesUnpacking and Inspecting the Chassis Required EquipmentRepeat steps 1to 3 for the other three adapters Attaching the Round Hole Adapter Kit to the Rails OptionalRight tool-less rack mount rail Left tool-less rack mount rail10-32 Phillips round washer head screws Cage nuts Round hole adapters threadedAdjusting the Tool-less Rack Mount Rail Installing the RailsInstalling Tool-less Chassis Support Rails into the Rack Proper Placement for the Rails and Cage Nuts Left rail Right rail Installing the Round Hole Adapter KitAttaching the Mounting Brackets to a Round Hole Rack Round Hole Adapter and Rails Installed in a Rack Inserting the Chassis into the Rack Mounting Rail Weight Distribution Square Hole Mount ShownSecuring the Chassis Into the Rack Required Tools Connecting a DC Power SupplyProcedure Inch holes measuring .625 inches from center to center Port Groups for Fabric Port Channels Cabling Considerations for Fabric Port ChannelsProper FEX and Fabric Interconnect Port Connectivity Fabric Interconnect B Rear Port Removing the Chassis from a Rack Gb Ethernet -copper SFP+ 1 m, 3.28 ft SFP+ Twinax Copper TransceiversOptical SFP+ Transceivers Removing a Twinax Copper SFP+ Transceiver OL-20035-05