Cisco Systems N20C6508UPG, UCS 5100 manual Required Equipment, Unpacking and Inspecting the Chassis

Page 5

Installation

Required Equipment

Ensure that circuits are sized according to local and national codes. For North America, the power supply requires a 20 A circuit.

To prevent loss of input power, ensure that the total maximum loads on the circuits supplying power to the chassis are within the current ratings for the wiring and breakers.

Use the following torque values when installing the chassis:

10-32 screws: 20 in-lb

Required Equipment

Before you begin the installation, ensure that you have the following items:

Number 1 and number 2 Phillips-head screwdrivers with torque measuring capabilities

Tape measure and level

ESD wrist strap or other grounding device

Antistatic mat or antistatic foam

Unpacking and Inspecting the Chassis

Caution When handling chassis components, wear an ESD strap and handle modules by the carrier edges only.

Tip Keep the shipping container in case the chassis requires shipping in the future.

Note The chassis is thoroughly inspected before shipment. If any damage occurred during transportation or any items are missing, contact your customer service representative immediately.

Procedure

Step 1 Remove the chassis from its cardboard container. Save all packaging material.

Step 2 Compare the shipment to the equipment list provided by your customer service representative and verify that you have received the following items:

Any printed documentation

Tool-less rack-mount kit (N20-CRMK2=)mounting rails can be installed in a rack without the use of tools. The optional round hole adapter kit (N20-CRMK2-RHA=) does require tools.

ESD wrist strap

Cables with connectors (including the N20-BKVM=, which is the KVM/local I/O console dongle)

Cisco UCS 5108 Server Chassis Installation Guide

OL-20035-05

5

Image 5
Contents This chapter contains the following sections Following notes and warnings apply to all installation tasksCable Management Rack RequirementsBefore Airflow ConsiderationsMoving Server Chassis Installation GuidelinesUnpacking and Inspecting the Chassis Required EquipmentRepeat steps 1to 3 for the other three adapters Attaching the Round Hole Adapter Kit to the Rails OptionalRight tool-less rack mount rail Left tool-less rack mount rail10-32 Phillips round washer head screws Cage nuts Round hole adapters threadedAdjusting the Tool-less Rack Mount Rail Installing the RailsInstalling Tool-less Chassis Support Rails into the Rack Proper Placement for the Rails and Cage Nuts Left rail Right rail Installing the Round Hole Adapter KitAttaching the Mounting Brackets to a Round Hole Rack Round Hole Adapter and Rails Installed in a Rack Inserting the Chassis into the Rack Mounting Rail Weight Distribution Square Hole Mount ShownSecuring the Chassis Into the Rack Required Tools Connecting a DC Power SupplyProcedure Inch holes measuring .625 inches from center to center Port Groups for Fabric Port Channels Cabling Considerations for Fabric Port ChannelsProper FEX and Fabric Interconnect Port Connectivity Fabric Interconnect B Rear Port Removing the Chassis from a Rack Gb Ethernet -copper SFP+ 1 m, 3.28 ft SFP+ Twinax Copper TransceiversOptical SFP+ Transceivers Removing a Twinax Copper SFP+ Transceiver OL-20035-05