Cisco Systems UCS 5108, UCS 5100, N20C6508UPG manual Cabling Considerations for Fabric Port Channels

Page 19

Installation

Cabling Considerations for Fabric Port Channels

Step 7 Replace the terminal cover as shown. This cover should always be in place when power is applied to the terminals.

Step 8 Connect the other end of the power wires to a DC-power input source.

Step 9 Set the DC disconnect switch in the circuit to ON.

Caution In a system with multiple power supplies, connect each power supply to a separate DC power source. In the event of a power source failure, if the second source is still available, it can maintain system operation.

Step 10 Verify power supply operation by checking the power supply's front-panel LEDs. You should see the following:

The LED labeled INPUT OK is green.

The LED labeled OUTPUT FAIL is not lit.

Step 11 Check the power supply and system status from the UCS console by entering the show system command or the show power command, do using the GUI. For more information on these commands, refer to the command reference for your software.

Cabling Considerations for Fabric Port Channels

When you configure the links between the Cisco UCS 2200 Series FEX and a Cisco UCS 6200 series fabric interconnect in fabric port channel mode, the available VIF namespace on the adapter varies depending on where the FEX uplinks are connected to the fabric interconnect ports.

Inside the 6248 fabric interconnect there are six sets of eight contiguous ports, with each set of ports managed by a single chip. When uplinks are connected such that all of the uplinks from an FEX are connected to a set of ports managed by a single chip, Cisco UCS Manager maximizes the number of VIFs used in service profiles deployed on the blades in the chassis. If uplink connections from an IOM are distributed across ports managed by separate chips, the VIF count is decreased.

Figure 14: Port Groups for Fabric Port Channels

1

3

5

7

9

11

13

15

17

19

21

23

25

27

29

31

1

3

5

7

9

11

13

15

2

4

6

8

10

12

14

16

18

20

22

24

26

28

30

32

2

4

6

8

10

12

14

16

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

330345

1

2

3

4

5

6

Caution Adding a second link to a fabric port channel port group is disruptive and will automatically increase the available amount of VIF namespace from 63 to 118. Adding further links is not disruptive and the VIF namespace stays at 118.

Cisco UCS 5108 Server Chassis Installation Guide

OL-20035-05

19

Image 19
Contents This chapter contains the following sections Following notes and warnings apply to all installation tasksCable Management Rack RequirementsBefore Airflow ConsiderationsMoving Server Chassis Installation GuidelinesUnpacking and Inspecting the Chassis Required EquipmentRepeat steps 1to 3 for the other three adapters Attaching the Round Hole Adapter Kit to the Rails OptionalRound hole adapters threaded Left tool-less rack mount railRight tool-less rack mount rail 10-32 Phillips round washer head screws Cage nutsAdjusting the Tool-less Rack Mount Rail Installing the RailsInstalling Tool-less Chassis Support Rails into the Rack Proper Placement for the Rails and Cage Nuts Left rail Right rail Installing the Round Hole Adapter KitAttaching the Mounting Brackets to a Round Hole Rack Round Hole Adapter and Rails Installed in a Rack Inserting the Chassis into the Rack Mounting Rail Weight Distribution Square Hole Mount ShownSecuring the Chassis Into the Rack Required Tools Connecting a DC Power SupplyProcedure Inch holes measuring .625 inches from center to center Port Groups for Fabric Port Channels Cabling Considerations for Fabric Port ChannelsProper FEX and Fabric Interconnect Port Connectivity Fabric Interconnect B Rear Port Removing the Chassis from a Rack Gb Ethernet -copper SFP+ 1 m, 3.28 ft SFP+ Twinax Copper TransceiversOptical SFP+ Transceivers Removing a Twinax Copper SFP+ Transceiver OL-20035-05