Cisco Systems UCS 5100, UCS 5108, N20C6508UPG manual Optical SFP+ Transceivers

Page 24

Installation

Optical SFP+ Transceivers

Model

Description

SFP-H10GB-CU3M

10-Gb Ethernetcopper SFP+ (3 m, 9.84 ft.)

SFP-H10GB-CU5M

10-Gb Ethernetcopper SFP+ (5 m, 16.4 ft.)

SFP-H10GB-ACU7M

10-Gb Ethernetcopper SFP+ (7 m, 22.9 ft.)

SFP-H10GB-ACU10M

10-Gb Ethernetcopper SFP+ (10 m, 32.8 ft.)

The figure below shows the SFP-H10GB-CU5M transceiver. The rubber loop is used for removing the SFP+ from its port on the I/O module.

Figure 17: SFP+ 10 Gb Twinax Copper Transceiver

187492

Optical SFP+ Transceivers

If distances greater than 10 meters (33 feet) must be spanned, the FEX also supports the substitution of the copper SFP+ by optical SFP+ transceivers. The SFP+ 10-Gb Ethernet optical transceiver is a bidirectional device with a transmitter and receiver in the same physical package. It has a duplex LC connector on the optical interface.

Model

Description

SFP-10G-SR

Shortrange optical SFP+ (up to 300 m/ 984 feet)

SFP-10G-LR 1

Longrange optical SFP+ (up to 10 km/6.2 miles)

1While the SFP-10G-LR is supported by both the fabric interconnect and I/O module, the maximum distance will introduce latency issues that will affect overall performance.

Documentation for SFP+ 10-Gb Ethernet optical transceivers is at

http://www.cisco.com/en/US/docs/interfaces_modules/transceiver_modules/installation/note/78_15160.html

Cisco UCS 5108 Server Chassis Installation Guide

24

OL-20035-05

Image 24
Contents Following notes and warnings apply to all installation tasks This chapter contains the following sectionsRack Requirements Cable ManagementAirflow Considerations BeforeInstallation Guidelines Moving Server ChassisRequired Equipment Unpacking and Inspecting the ChassisAttaching the Round Hole Adapter Kit to the Rails Optional Repeat steps 1to 3 for the other three adaptersLeft tool-less rack mount rail Right tool-less rack mount rail10-32 Phillips round washer head screws Cage nuts Round hole adapters threadedInstalling the Rails Adjusting the Tool-less Rack Mount RailInstalling Tool-less Chassis Support Rails into the Rack Proper Placement for the Rails and Cage Nuts Installing the Round Hole Adapter Kit Left rail Right railAttaching the Mounting Brackets to a Round Hole Rack Round Hole Adapter and Rails Installed in a Rack Mounting Rail Weight Distribution Square Hole Mount Shown Inserting the Chassis into the RackSecuring the Chassis Into the Rack Connecting a DC Power Supply Required ToolsProcedure Inch holes measuring .625 inches from center to center Cabling Considerations for Fabric Port Channels Port Groups for Fabric Port ChannelsProper FEX and Fabric Interconnect Port Connectivity Fabric Interconnect B Rear Port Removing the Chassis from a Rack SFP+ Twinax Copper Transceivers Gb Ethernet -copper SFP+ 1 m, 3.28 ftOptical SFP+ Transceivers Removing a Twinax Copper SFP+ Transceiver OL-20035-05