Rack Requirements

Warning Only trained and qualified personnel must be allowed to install, replace, or service this equipment. Statement 1030

Rack Requirements

This section provides the requirements for installing in a standard open rack, assuming an external ambient air temperature range of 50 to 95°F (10 to 35°C):

Note Do not use racks that have obstructions. These obstructions could impair access to field-replaceable units (FRUs).

The Cisco R Series Racks are an ideal choice. If other racks will be used, the rack must be of the following type:

Standard 19-inch (48.3 cm) four-post EIA rack, a minimum of 39.4 inches (100 cm) deep, with mounting rails that conform to English universal hole spacing per section 1 of ANSI/EIA-310-D-1992.

The mounting holes of the rails in the rack must be square (unless the optional round hole adapter kit is used).

The tool-less rack-mount kit shipped with the chassis is required. The adjustable rack rails shipped with each enclosure extend from 29 inches (73.66 cm) to 35 inches (88.9 cm)

Front and rear doorsIf your server rack includes closing front and rear doors, the doors must have 65 percent open perforated area evenly distributed from top to bottom to permit adequate airflow.

Caution Always use blanking panels to fill all remaining empty front panel U-spaces in the rack. This arrangement ensures proper airflow. Using a rack without blanking panels results in improper cooling that can lead to thermal damage.

The rack must also meet the following requirements:

The minimum available vertical rack space per chassis must be six RU (rack units), equal to 10.5 inches (26.7 cm).

Cable Management

To help with cable management, allow additional space in the rack above and below the chassis to make it easier to route copper cables (plus up to eight copper cables per Cisco UCS 5108 server chassis) through the rack.

Cable management can be an important factor in preventing overheating issues. In the following figure, the beforeillustration shows cables blocking the rear of the chassis, and preventing the fans from exhausting warm air from the chassis. This situation causes failed DIMMs in the blade servers, and seemingly random

 

Cisco UCS 5108 Server Chassis Installation Guide

2

OL-20035-05

Image 2
Contents Following notes and warnings apply to all installation tasks This chapter contains the following sectionsRack Requirements Cable ManagementAirflow Considerations BeforeInstallation Guidelines Moving Server ChassisRequired Equipment Unpacking and Inspecting the ChassisAttaching the Round Hole Adapter Kit to the Rails Optional Repeat steps 1to 3 for the other three adapters10-32 Phillips round washer head screws Cage nuts Left tool-less rack mount railRight tool-less rack mount rail Round hole adapters threadedInstalling the Rails Adjusting the Tool-less Rack Mount RailInstalling Tool-less Chassis Support Rails into the Rack Proper Placement for the Rails and Cage Nuts Installing the Round Hole Adapter Kit Left rail Right railAttaching the Mounting Brackets to a Round Hole Rack Round Hole Adapter and Rails Installed in a Rack Mounting Rail Weight Distribution Square Hole Mount Shown Inserting the Chassis into the RackSecuring the Chassis Into the Rack Connecting a DC Power Supply Required ToolsProcedure Inch holes measuring .625 inches from center to center Cabling Considerations for Fabric Port Channels Port Groups for Fabric Port ChannelsProper FEX and Fabric Interconnect Port Connectivity Fabric Interconnect B Rear Port Removing the Chassis from a Rack SFP+ Twinax Copper Transceivers Gb Ethernet -copper SFP+ 1 m, 3.28 ftOptical SFP+ Transceivers Removing a Twinax Copper SFP+ Transceiver OL-20035-05