Cisco Systems UCS 5108, UCS 5100 Left tool-less rack mount rail, Right tool-less rack mount rail

Page 7

Installation

Installing the Chassis

Installing the Chassis

This section describes how to install the chassis. This two part process consists of installing the rails into the rack and then installing the chassis into the rack and on to the rails.

Caution Never attempt to lift the chassis by using an installed modules handle as a grip point. only use the handles on the sides of the chassis.

Caution If the rack has wheels, ensure that the brakes are engaged, the stabilizing pads are extended, or that the rack is otherwise stabilized.

Table 1: Contents of the Cisco UCS 5108 Server Chassis Rack-Mount Kit (N20-CRMK2=)

Quantity

Part Description

1

Left tool-less rack mount rail

1

Right tool-less rack mount rail

6

10-32

X 0.75 Phillips round washer head screws

6

10-32

X 0.125 cage nuts

Table 2: Contents of the Cisco UCS 5108 Server Round Hole Adapter Kit (N20-CRMK2-RHA=)

Quantity

Part Description

4

Round hole adapters (threaded)

4

Round hole adapters (un-threaded)

4

Adapter securing screws

16

Phillips head screws for securing the rails to the rack

Warning The plug-socket combination must be accessible at all times, because it serves as the main disconnecting device. Statement 1019

Cisco UCS 5108 Server Chassis Installation Guide

OL-20035-05

7

Image 7
Contents This chapter contains the following sections Following notes and warnings apply to all installation tasksCable Management Rack RequirementsBefore Airflow ConsiderationsMoving Server Chassis Installation GuidelinesUnpacking and Inspecting the Chassis Required EquipmentRepeat steps 1to 3 for the other three adapters Attaching the Round Hole Adapter Kit to the Rails OptionalRound hole adapters threaded Left tool-less rack mount railRight tool-less rack mount rail 10-32 Phillips round washer head screws Cage nutsAdjusting the Tool-less Rack Mount Rail Installing the RailsInstalling Tool-less Chassis Support Rails into the Rack Proper Placement for the Rails and Cage Nuts Left rail Right rail Installing the Round Hole Adapter KitAttaching the Mounting Brackets to a Round Hole Rack Round Hole Adapter and Rails Installed in a Rack Inserting the Chassis into the Rack Mounting Rail Weight Distribution Square Hole Mount ShownSecuring the Chassis Into the Rack Required Tools Connecting a DC Power SupplyProcedure Inch holes measuring .625 inches from center to center Port Groups for Fabric Port Channels Cabling Considerations for Fabric Port ChannelsProper FEX and Fabric Interconnect Port Connectivity Fabric Interconnect B Rear Port Removing the Chassis from a Rack Gb Ethernet -copper SFP+ 1 m, 3.28 ft SFP+ Twinax Copper TransceiversOptical SFP+ Transceivers Removing a Twinax Copper SFP+ Transceiver OL-20035-05