Cisco Systems UCS 5100, UCS 5108 manual Installing Tool-less Chassis Support Rails into the Rack

Page 9

Installation

Installing the Rails

The following figure shows a rail mounted into a rack in the proper position with respect to a rack-unit boundary. Measurements are in inches between the centers of the holes.

Figure 5: Installing Tool-less Chassis Support Rails into the Rack

192518

Step 4 Press down firmly on the rail until the hooks seat firmly and securely into the holes, and the spring clip latches into place.

Step 5 Follow the same procedure to install the other rack rail.

Step 6 Use a tape measure and level to verify that the rack rails are horizontal and at the same height.

Step 7 Insert the cage nuts on to the rack in the needed square holes as shown below. When the rails are installed on a rack unit boundary, the first two cage nuts are installed into the seventh holes above the railshorizontal

Cisco UCS 5108 Server Chassis Installation Guide

OL-20035-05

9

Image 9
Contents This chapter contains the following sections Following notes and warnings apply to all installation tasksCable Management Rack RequirementsBefore Airflow ConsiderationsMoving Server Chassis Installation GuidelinesUnpacking and Inspecting the Chassis Required EquipmentRepeat steps 1to 3 for the other three adapters Attaching the Round Hole Adapter Kit to the Rails OptionalRight tool-less rack mount rail Left tool-less rack mount rail10-32 Phillips round washer head screws Cage nuts Round hole adapters threadedAdjusting the Tool-less Rack Mount Rail Installing the RailsInstalling Tool-less Chassis Support Rails into the Rack Proper Placement for the Rails and Cage Nuts Left rail Right rail Installing the Round Hole Adapter KitAttaching the Mounting Brackets to a Round Hole Rack Round Hole Adapter and Rails Installed in a Rack Inserting the Chassis into the Rack Mounting Rail Weight Distribution Square Hole Mount ShownSecuring the Chassis Into the Rack Required Tools Connecting a DC Power SupplyProcedure Inch holes measuring .625 inches from center to center Port Groups for Fabric Port Channels Cabling Considerations for Fabric Port ChannelsProper FEX and Fabric Interconnect Port Connectivity Fabric Interconnect B Rear Port Removing the Chassis from a Rack Gb Ethernet -copper SFP+ 1 m, 3.28 ft SFP+ Twinax Copper TransceiversOptical SFP+ Transceivers Removing a Twinax Copper SFP+ Transceiver OL-20035-05