8e6 Technologies MSA-004-005 quick start Install the Chassis into the Rack

Page 18

Install the Chassis into the Rack

CAUTION: Before installing the chassis into the rack:

Make sure that the rack is securely anchored onto an unmovable surface or structure before installing the chassis into the rack.

Unplug power cord(s) of the rack before installing the chassis into the rack.

Make sure that the system is adequately supported. Make sure that all the components are securely fastened to the chassis to prevent components fall- ing off from the chassis.

The rack assembly should be properly grounded to avoid electric shock.

The rack assembly must provide sufficient airflow to the chassis for proper cooling.

Please make sure that all components and all chassis covers are properly in- stalled in the chassis before you install the chassis into the racks; otherwise, out-of-warranty damage may occur.

Slide the chassis into the rack and secure it with two screws on each side of the rack as shown in the picture.

14

8e6 ProxyBlocker Quick Start Guide

Image 18
Contents Guide 8e6 ProxyBlocker Quick Start Guide Contents 8e 6 Proxy Blocker Quick Start Guide 8e6 ProxyBlocker Introduction About this Document Conventions Used in this DocumentProcedures 8e6 Corporate Headquarters USA8e6 Taiwan Unpack the Unit from the Carton Select a Site for the Server Rack Setup Precautions Rack Mount the ServerOptional Install the Chassis Rails Rack Mount Instructions8e6 ProxyBlocker Quick Start Guide Optional Install the Traditional UP Racks 8e6 ProxyBlocker Quick Start Guide Optional Install the Open Racks 8e6 ProxyBlocker Quick Start Guide 8e6 ProxyBlocker Quick Start Guide Install the Chassis into the Rack Check the Power Supply Power Supply PrecautionsGeneral Safety Information Server Operation and Maintenance PrecautionsAC Power Cord and Cable Precautions Electrical Safety PrecautionsMotherboard Battery Precautions Setup Procedures Wizard Setup RequirementsAdministrator Console Setup Requirements Serial Console Setup Wizard Setup ProceduresMonitor and Keyboard Setup Link the Workstation to the ProxyBlockerHyperTerminal Setup Procedures 8e6 ProxyBlocker Quick Start Guide 8e6 ProxyBlocker Quick Start Guide Login screen System Configuration ScreenSystem Configuration Administration menu System Status Screen Log Off, Disconnect the PeripheralsConsole Setup Procedures Preliminary SetupWorkstation Configurations Boot Up Process Network Setup Access the ProxyBlocker Administrator ConsoleLog in to ProxyBlocker Administrator Console Network Network Operation Mode Network LAN Settings Network NTP Servers Network Regional Setting Physically Connect the ProxyBlocker to the Network Test the ProxyBlocker Console Connection Set Library Updates Test FilteringActivate and Register the ProxyBlocker Perform a Complete Library Update Monitor the Library Update Process Conclusion LED Indicator Key Button Key LED Indicator Color Condition DescriptionMSA Units Electromagnetic Compatibility EMC Safety ComplianceDeclaration of the Manufacturer or Importer Electromagnetic Compatibility Class a NoticeEC Declaration of Conformity Index Wizard setup 19 8e6 ProxyBlocker Quick Start Guide