AC Power Cord and Cable Precautions

Warning:

The AC power cord for the server must be plugged into a grounded, power outlet.

Do not modify or use a supplied AC power cord if it is not the exact type required in the region where the server will be installed and used. Replace the cord with the cor- rect type.

Route the AC power cord and cables away from moving parts and foot traffic.

Do not allow anything to rest on the AC power cord and cables.

Never use the server if the AC power cord has been damaged.

Always unplug the AC power cord before removing the unit for servicing.

Electrical Safety Precautions

Warning:

Heed the following safety precautions to protect yourself from harm and the server from damage:

CAUTION: Dangerous voltages associated with the 100-240 V AC power supply are present inside the unit. To avoid injury or electrical shock, do not touch exposed connections or components while the power is on.

To prevent damage to the server, read the information in this document for selection of the proper input voltage.

Do not wear rings or wristwatches when troubleshooting electrical circuits.

To avoid fire hazard, use only the specified fuse(s) with the correct type number, volt- age, and current ratings. Only qualified service personnel should replace fuses.

Qualified service personnel should be properly grounded when servicing the unit.

Qualified service personnel should perform a safety check after any service is per- formed.

8e6 ProxyBlocker Quick Start Guide

17

Image 21
Contents Guide 8e6 ProxyBlocker Quick Start Guide Contents 8e 6 Proxy Blocker Quick Start Guide 8e6 ProxyBlocker Introduction Conventions Used in this Document About this DocumentProcedures 8e6 Corporate Headquarters USA8e6 Taiwan Unpack the Unit from the Carton Select a Site for the Server Rack Mount the Server Rack Setup PrecautionsRack Mount Instructions Optional Install the Chassis Rails8e6 ProxyBlocker Quick Start Guide Optional Install the Traditional UP Racks 8e6 ProxyBlocker Quick Start Guide Optional Install the Open Racks 8e6 ProxyBlocker Quick Start Guide 8e6 ProxyBlocker Quick Start Guide Install the Chassis into the Rack Power Supply Precautions Check the Power SupplyServer Operation and Maintenance Precautions General Safety InformationElectrical Safety Precautions AC Power Cord and Cable PrecautionsMotherboard Battery Precautions Setup Procedures Wizard Setup RequirementsAdministrator Console Setup Requirements Monitor and Keyboard Setup Wizard Setup ProceduresSerial Console Setup Link the Workstation to the ProxyBlockerHyperTerminal Setup Procedures 8e6 ProxyBlocker Quick Start Guide 8e6 ProxyBlocker Quick Start Guide System Configuration Screen Login screenSystem Configuration Administration menu Log Off, Disconnect the Peripherals System Status ScreenConsole Setup Procedures Preliminary SetupWorkstation Configurations Boot Up Process Access the ProxyBlocker Administrator Console Network SetupLog in to ProxyBlocker Administrator Console Network Network Operation Mode Network LAN Settings Network NTP Servers Network Regional Setting Physically Connect the ProxyBlocker to the Network Test the ProxyBlocker Console Connection Set Library Updates Test FilteringActivate and Register the ProxyBlocker Perform a Complete Library Update Monitor the Library Update Process Conclusion LED Indicator Key Button Key LED Indicator Color Condition DescriptionMSA Units Declaration of the Manufacturer or Importer Safety ComplianceElectromagnetic Compatibility EMC Electromagnetic Compatibility Class a NoticeEC Declaration of Conformity Index Wizard setup 19 8e6 ProxyBlocker Quick Start Guide