8e6 Technologies MSA-004-005 quick start Select a Site for the Server

Page 9

Select a Site for the Server

The server operates reliably within normal office environmental limits. Select a site that meets the following criteria:

Clean and relatively free of excess dust.

Well-ventilated and away from sources of heat, with the ventilating openings on the server kept free of obstructions.

Away from sources of vibration or physical shock.

Isolated from strong electromagnetic fields and noise caused by electrical devices such as elevators, copy machines, air conditioners, large fans, large electric motors, radio and TV transmitters, and high-frequency security devices.

Access space provided so the server power cord can be unplugged from the power supply or the wall outlet—this is the only way to remove the AC power cord from the server.

Clearance provided for cooling and airflow: Approximately 30 inches (76.2 cm) in the back and 25 inches (63.5 cm) in the front.

Located near a properly earthed, grounded, power outlet.

8e6 ProxyBlocker Quick Start Guide



Image 9
Contents Guide 8e6 ProxyBlocker Quick Start Guide Contents 8e 6 Proxy Blocker Quick Start Guide 8e6 ProxyBlocker Introduction Conventions Used in this Document About this DocumentProcedures 8e6 Corporate Headquarters USA8e6 Taiwan Unpack the Unit from the Carton Select a Site for the Server Rack Mount the Server Rack Setup PrecautionsRack Mount Instructions Optional Install the Chassis Rails8e6 ProxyBlocker Quick Start Guide Optional Install the Traditional UP Racks 8e6 ProxyBlocker Quick Start Guide Optional Install the Open Racks 8e6 ProxyBlocker Quick Start Guide 8e6 ProxyBlocker Quick Start Guide Install the Chassis into the Rack Power Supply Precautions Check the Power SupplyServer Operation and Maintenance Precautions General Safety InformationElectrical Safety Precautions AC Power Cord and Cable PrecautionsMotherboard Battery Precautions Setup Procedures Wizard Setup RequirementsAdministrator Console Setup Requirements Monitor and Keyboard Setup Wizard Setup ProceduresSerial Console Setup Link the Workstation to the ProxyBlockerHyperTerminal Setup Procedures 8e6 ProxyBlocker Quick Start Guide 8e6 ProxyBlocker Quick Start Guide System Configuration Screen Login screenSystem Configuration Administration menu Log Off, Disconnect the Peripherals System Status ScreenConsole Setup Procedures Preliminary SetupWorkstation Configurations Boot Up Process Access the ProxyBlocker Administrator Console Network SetupLog in to ProxyBlocker Administrator Console Network Network Operation Mode Network LAN Settings Network NTP Servers Network Regional Setting Physically Connect the ProxyBlocker to the Network Test the ProxyBlocker Console Connection Set Library Updates Test FilteringActivate and Register the ProxyBlocker Perform a Complete Library Update Monitor the Library Update Process Conclusion LED Indicator Key Button Key LED Indicator Color Condition DescriptionMSA Units Declaration of the Manufacturer or Importer Safety ComplianceElectromagnetic Compatibility EMC Electromagnetic Compatibility Class a NoticeEC Declaration of Conformity Index Wizard setup 19 8e6 ProxyBlocker Quick Start Guide