PowerFile A3 manual Electrical Distribution System Precautions

Page 12

4

Introduction

Electrical Distribution System Precautions

The rack should have a safe electrical distribution system. It must provide overcurrent protection for the unit and must not be overloaded by the total number of units installed in the rack. Consideration of the electrical power consumption rating shown on the nameplate should be used when addressing these concerns.

The electrical distribution system must provide reliable grounding for each unit in the rack.

Each power supply in each unit has an earth leakage current of 1.8mA. The design of the electrical distribution system must take into consideration the total earth leakage current from all the power supplies in all the units.

For full compliance, the rack should be labeled “HIGH LEAKAGE CURRENT. Earth connection essential before connecting supply”.

The fully loaded and configured rack must meet the UL 60950-1 and IEC 60950-1 safety requirements.

This equipment is intended to operate with two working PSUs installed in the Power Supply Module. Before removal/replacement disconnect all supply for complete isolation.

A faulty Power Supply unit must be replaced with a fully operational unit within 24 hours.

There are two power supplies in the Archive Engine. It is important to connect both power supplies. It is recommended that each of the power supplies be attached to a separate UPS with built in surge protection and line conditioning.

WARNING: DO NOT use a UPS (Universal Power Supply) with automatic shutdown or so called smart features. The PowerFile system does not support these features. Use a simple UPS to protect your system from power blackouts and “brownouts.”

Active Archive Appliance (A3) v6.5

PowerFile Confidential

Racking and Installation Guide

Image 12
Contents Racking and Installation Guide PowerFile, Inc Contents Installing the Media Library in a Back-to-Back Configuration Front Panel HDDs and LEDs Contents About This Guide PurposeAudience Related DocumentsActive Archive Appliance A3 PowerFile Confidential Introduction This ChapterA3 System Shipping Components Archive Engine GenerationIntroduction Rack System Precautions Media Library Generation 2 or GenerationElectrical Distribution System Precautions Preparing for Installation Preparing for SetupUnpacking the A3 System Choosing a Setup Location Rack Mounting ConsiderationsInstalling the Archive Engine Determining the Archive Engine ModelInstalling the Archive Engine Generation Identifying the Rail Kit HardwareInstalling the Archive Engine M5 Spring Washer Archive Engine Generation Archive Engine Rail Assembly Generation Archive Engine Rail Assembly Close Up Generation Mounting the Archive Engine in the Rack Installing the Archive Engine Generation Identifying the Rail Kit Components Attaching the Inner Rail ExtensionsArchive Engine Generation 2 Inner Rail Assembly Detail Archive Engine Generation 2 Outer Rail Assembly Detail Attaching the Outer RailsAttaching the Extension Brackets Archive Engine Generation 2 Extension BracketArchive Engine Rack Assembly Installing the Archive Engine Installing the Archive Engine Installing the Media Library in a Front-mount Configuration Front-mount ConfigurationSetting Up the Front-mounted Chassis Getting StartedMedia Library Self-tapping Screws Media Library Keyhole Screws Media Library Inner Slide Rails and Keyhole Screws Installing the Outer Rails on the Front-mounted Chassis Media Library Inner Slide Rail and Self-tapping ScrewsMedia Library Inner Slide Rail on Front-mount Configuration Mounting-bracket Flanges on Outer Rail Mounting-bracket Flange Close UpOuter Rail Installed in Rack Mounting-bracket Flange AttachedInstalling the Chassis in the Rack Media Library Aligned with Rack RailsMedia Library Rail Latch Media Library Rail Latch Close UpMedia Library in Front-mount Configuration Attaching the Media Library FeetMedia Library Feet Installing the Media Library in a Back-to-Back Configuration Back-to-Back ConfigurationRack Specifications Power Strip RequirementsBack-to-Back Configuration Setting Up the Front-mounted Chassis Media Library Keyhole Screws Media Library Inner Slide Rails and Keyhole Screws Setting Up the Rear-mounted Chassis Media Library Keyhole Screws Installing the Inner Slide Rails on the Rear-mounted Chassis Media Library Inner Slide Rails and Self-tapping ScrewsOuter Rail Front-mounted Chassis Inner Slide Rail Mounting-bracket Flanges on Outer Rail Mounting-bracket Flange Attached Installing the Outer Rails on the Rear-mounted Chassis Mounting-bracket Flanges on Outer Rail Mounting-bracket Flange Attached Installing the Chasses in the Rack Media Library Rail Latch Media Libraries in Back-to-Back Configuration Installing the Cache Expansion Unit Identifying the Rail Kit Components Before You Begin Attaching the Mounting Brackets and RailsMounting Bracket Attached to Fixed Rail Front Panel HDDs and LEDs HDD Bays and LEDsSetting Up the A3 System Connecting the Archive Engine and Media LibrariesTo connect the Archive Engine and Media Libraries Archive Engine Ethernet Jack ConnectionsArchive Engine and Media Library Connections Connecting Cache Expansion Arrays Connecting Two Cache Expansion Arrays to an Archive EngineCache Expansion Array Connectors Two Cache Expansion Arrays and Archive Engine Connections Connecting One Cache Expansion Array to an Archive Engine One Cache Expansion Array and Archive Engine ConnectionsPowering On the A3 System Powering On the Media LibraryPowering On the Cache Expansion Array Media Library Power ButtonPowering On the Archive Engine Generation Cache Expansion Array Power ConnectorsArchive Engine Generation 1 Power Button and Alarm Button Archive Engine Generation 2 Power Button Loading Qualification Media in Media Library GenerationPowering Off the A3 System Contacting PowerFile 951-13035-04 A3 Racking and Installation Guide