Trango Broadband TrangoLINK-45TM Deployment & Installation, Site Selection, Site survey

Page 32

Deployment & Installation

Site Selection

Chapter 4 Deployment & Installation

Once you are familiar with the basic operation of the radios you are ready for deployment in the field. The deployment process consists of the following steps:

Site Selection

Site survey at MU and RU sites

MU installation

RU installation and antenna alignment

Link test

Site Selection

Proper site selection for your MU will help ensure a successful deployment. Site selection will depend on a wide variety of factors, but from the radio’s performance standpoint, please consider the following:

Path from MU to RU should provide unobstructed line-of-sight (LOS), thus it is advisable to place MU as high as possible on a tall building or tower.

Ethernet cable limit is 100 meters from Ethernet device (router, switch) to radio.

Radios should never be deployed without proper grounding.

Consider nearby sources of interference that could degrade the performance of the radio. Mount radios as far from sources of interference as possible.

Site survey

The radios provide an on-board site survey tool which measure the average and peak noise levels on any given channel.

To use the survey tool, the radio must be in Opmode “OFF.” The survey can be performed for any specified amount of time (in seconds), and for specific channels or for all channel/antenna polarization combinations.

Prior to performing the site survey, place the radio in the installation spot, and aim the radio in the desired direction.

The survey command will display the average and peak noise floor for each channel as well as average and peak RSSI received during the same period for 802.11 packets.

Users may run any of the following variations of the survey command:

survey

survey [<sec>] survey <sec> all survey <sec> [<ch#> [..]]

display noise floor for current channel based on 10 second scan.

display noise floor for current channel for period <sec> 10..3600 seconds display noise floor for all available channels where <sec> = period per channel display noise floor for selected channels (max 4) where <sec> = period per channel

<ch#> = channel number

Example:

all

 

 

 

#> survey 10

 

 

 

Press 'q' to stop.

 

rssi by pkt (peak/avg dBm)

 

noise floor (peak/avg dBm)

Ch

1

h 5265

:

-97 / -98

n/a / n/a

Ch

1

v

:

-97 / -98

n/a / n/a

Ch

2

h 5285

:

-97 / -98

n/a / n/a

Ch

2

v

:

-97 / -98

n/a / n/a

Ch

3

h 5305

:

-97 / -98

n/a / n/a

Ch

3

v

:

-97 / -98

n/a / n/a

Ch

4

h 5325

:

-98

/ -98

n/a / n/a

Ch

4

v

:

-97

/ -98

n/a / n/a

Ch

5

h 5500

:

-98

/ -98

n/a / n/a

 

 

Trango Broadband Wireless — TrangoLINK-45

page 32

Image 32
Contents Ffirm TrangoLINK-45 Point-to-Point Wireless Ethernet Bridge DFS Ofdm Firmware Upgrade Procedure Preface FCC InformationWarranty Information Industry Canada InformationEurope Information Email sales@trangobroadband.com Overview Adaptive ModulationARQ Dual Polarity AntennaRange vs. Throughput ISM 5725 MHz to 5875 MHz Line-of-Sight Range & ThroughputSystem Contents Location of RJ-45/LED Port & IP Reset Button Location of Serial Number & MAC AddressConnections and Power Getting StartedConfiguration Tools Changing PasswordTroubleshooting Ethernet Connections System Information sysinfoSysinfo Example MAC Rssi LED RssiARQ Getting Started System Information sysinfo Configuration Essentials to Establish a Wireless LinkMaster Unit Configuration Key ConceptsRemote Unit Configuration LEDs Establishing a Wireless LinkChanging IP Address RF Link Loopback Test linktest command Command format linktest loc speed peer speedSuccess Link Speed & Power Settings BpskQpsk 16QAMMU Autoscan Feature Description Important Note for -EU ModelsAutomatic Rate Shifting Feature Description Encryption Feature Description MIR Feature DescriptionCommand Reference Listing Configuration Command Reference Listing Configuration Command Reference Listing Site survey Deployment & InstallationSite Selection Channel Planning Rssi Command and Antenna Alignment Port Plug and Port Plate Hardware Mounting HardwareConnecting External Antenna on EXT Model WeatherizingGrounding Cat-5 Cabling ConsiderationsSnmp SnmpFirmware Upgrade Procedure Firmware Upgrade PasswordUpgrade Procedure Example 1 Upgrade main image firmware to 1.0a6From Computer Command Prompt Session Appendix a Using the Http Interface Appendix a MAC Configuration Appendix a Connection Status Site Survey Link Control Appendix B Specifications RF ParametersChannels of Operation FEC & ARQAppendix B Specifications Etsi Data ParametersRegulatory Compliance Power Parameters Power SupplyMechanical EnvironmentalAntennas Vswr