Wybron pmn user manual Power Supply hanger brackets

Page 19

Power Supply hanger brackets

The Coloram II Power Supplies are shipped with hanger brackets to allow pipe or truss mounting.

Follow these steps to install the hanger bracket.

1.Disconnect AC power from the Power Supply.

2.Place the Power Supply on it’s side on a flat surface.

3.Position the brackets as shown below.

4.Attach the bracket using a 3/16" Allen wrench and the supplied screws.

Note: Use the supplied thumb screws to clamp the hanger brackets to the desired pipe or truss.

90-250VAC50/60HZ 4AMPSLO-BLOAT115VAC 2AMPSLO-BLOAT230VAC

Figure 6

SUPPLY

POWER

 

 

 

WAY 12

 

 

 

19012

 

 

 

Figure 10

19

Image 19
Contents Page Contents Introduction Coloram II System Color Changers and Other Components Coloram II System ComponentsColoram Cables Power SupplyColoram II Power Supply menu RUN Screen Loop Power UP ScreensAlerts / Error Messages Menu DetailsPage XX Units For The CXI color changer Setup Options 001001 + Commands001 + + Connect the Color Changers to the Power Supply Mount the Power SupplySet the Power Supply/Color Changer channels Connect the Power Supply to AC powerConnect and set the DMX512 source Head-Feet RestrictionsHead-Feet Example Mounting and installation accessoriesPower Supply hanger brackets Power Supply rack mounting Cables Equipment CompatibilityColoram cable Coloram II Power Supply SpecificationsDMX512 control cable Software Version Changes Parts listColoram II Power Supplies Coloram II mounting and installation accessoriesColoram II System cable Warranty informationWYBRON, INC. TEL 719-548-9774- FAX