MGE UPS Systems GES-102L, GES-202L, GES-152L, GES-302L Battery Bank Installation, Black RED

Page 19

Always “On” UPS Systems Inc.

Battery Bank Installation

Install up to 8 battery banks per L Series UPS following the instructions below.

1

2

3

4

 

BLACK

 

 

RED

Caution: Make sure the UPS is shutdown and unplugged before connecting additional Battery Packs (refer to Switching the UPS “Off” section, page 11)

1.Locate the external battery connector located at the rear of the UPS.

2.Make sure you are connecting the connector correctly or problems will occur.

3.Insert the battery bank connector into the UPS.

4.The UPS is now ready to be turned on with extended runtime.

To install additional battery banks, repeat this procedure using the battery bank connectors on the back of the battery banks.

Note: Do not stack battery banks, and make sure proper polarity.

19

Image 19
Contents Uninterruptible Power Supply Always On UPS Systems Inc Always On UPS Systems Inc Battery Replacement Troubleshooting Storage Introduction 36VDC Safety InstructionsFront Panel PresentationTELEPHONE/MODEM/ETHERNET Surge Protection Rear PanelSite Wiring Fault Indicators RED LED Installation Check the Site Wiring Fault Indicator Connecting the Telephone/Modem/Ethernet LinesOperation Audible Alarm UPSilon 2000 Software Software OptionsInterface Kits Open Collector Dry Contact Communication Computer Interface PortRS-232 Communication Remove watches, rings, etc Use tools with insulated handles Battery ReplacementProblems Possible causes TroubleshootingSolution Storage Conditions StorageExtended Storage Black RED Battery Bank InstallationSpecification SpecificationsGES-801LR GES-102LR GES-152LR GES-202LR GES-302LR QA / Warranty Questions Additional Purchases or UpgradesSoftware Questions