American Power Conversion VT ISX manual Connecting 3-phase load to PDU

Page 24

Configuration – Connection of Load to the PDU

Connecting 3-phase load to PDU II

 

 

 

 

1

1

 

 

 

 

 

Set the applicable breaker set to the OFF position.

Guide the load cable down through the top hole.

Lift up the receptacle cover and connect the load to the CEE 32A outlet.

Set the breaker set to the ON position.

Connecting 1-phase load to PDU II

1

 

 

1

 

 

 

Set the applicable breaker to the OFF position.

Guide the load cable down through the top hole.

Lift up the receptacle cover and connect the load to the CEE 16A outlet.

Reset the breaker to the ON position.

18

Smart-UPS® ISX 30-40 kVA, 400V Operation

990-2820A

Image 24
Contents Operation Page How to find updates to this manual About this ManualCompanion manuals Page Contents Configuration Safety Overview System OverviewSystem Components Opening front and rear doorsUser interface front Battery Module User interface area rearDisplay Rear cover of this manualMenu tree Overview The DisplayBasic display navigation principles Control functionsSelect YES, Turn Load on Status viewsClock set-up LoggingSelect View Statistics Alarm threshold Display setupVol Volume Diagnostics screenOperation Operation ModesOperation Procedures Turn into normal operation from mechanical bypass operation Configuration Connecting load to the PDUsConnecting 1-phase load to PDU Connection of Load to the PDUConnecting 3-phase load to PDU Disconnecting load from the PDUs PDU output breaker ratingsParts Replacement How to determine if you need a replacement partHow to return parts to APC How to remove Battery Modules How to install a Battery Module How to replace a Network Management Card Troubleshooting Display messagesTroubleshooting Parts Replacement Troubleshooting Parts Replacement Power application RestartVoltage confirmation Page APC Worldwide Customer Support 990-2820A05/2006