American Power Conversion VT ISX manual Voltage confirmation

Page 34

Restart – Parts Replacement

Voltage confirmation

At the restart, the display will prompt you through the following screens:

Confirm Voltage

Use 400V

Yes, use 400V

No, select another

When the Confirm Voltage prompt appears on the screen, select desired voltage and press ENTER.

Apply load?

Yes

No

When the prompt Apply load appears, select Yes if you want the UPS to provide a load output now. (If you do not want a UPS load output at this point, select No).

Chrg xxx%

Load xxx%

xxxVin xxxVout xxHz Runtime: xxhr xxmin

Status screen

LOAD ON LED is now lit, and the display will show the Confirm Menu Screen.

The UPS is now ready to support the load.

Note

Auto-detection on frequency – if a problem occurs call APC Customer Support.

Note

Reinstall cable landing cover plates.

For any optional equipment, refer to product-specific manuals.

28

Smart-UPS® ISX 30-40 kVA, 400V Operation

990-2820A

Image 34
Contents Operation Page About this Manual How to find updates to this manualCompanion manuals Page Contents Configuration Safety Overview System OverviewSystem Components Opening front and rear doorsUser interface front Battery Module User interface area rearDisplay Rear cover of this manualMenu tree Overview The DisplayBasic display navigation principles Control functionsSelect YES, Turn Load on Status viewsClock set-up LoggingSelect View Statistics Alarm threshold Display setupVol Volume Diagnostics screenOperation Operation ModesOperation Procedures Turn into normal operation from mechanical bypass operation Connecting 1-phase load to PDU ConfigurationConnecting load to the PDUs Connection of Load to the PDUConnecting 3-phase load to PDU Disconnecting load from the PDUs PDU output breaker ratingsHow to determine if you need a replacement part Parts ReplacementHow to return parts to APC How to remove Battery Modules How to install a Battery Module How to replace a Network Management Card Troubleshooting Display messagesTroubleshooting Parts Replacement Troubleshooting Parts Replacement Power application RestartVoltage confirmation Page 990-2820A APC Worldwide Customer Support05/2006