Configuration
Connection of Load to the PDU
Connecting load to the PDUs
Connect the load evenly between the 3 phases to avoid overloading one particular single phase. The total output capacity of the PDU is approximately twice the output capability of the UPS, meaning that the UPS would be
Note rating. Load status on the individual phases can be found through the UPS display or through the web interface.
Equipment connected to the
Note
For
Note
Connecting 1-phase load to PDU I
|
|
| | |
|
| |
|
| |
|
|
|
|
| |
|
| |
|
| |
Set the applicable breaker to the OFF position.
Guide the load cable down through the top hole.
Insert the plug from the load into the C19 outlet.
Secure the plug by inserting the locking brackets.
Set the applicable breaker to the ON position.
17 |