American Power Conversion CTFLP Series Installation and Maintenance, Unpacking, Ctflp Enclosure

Page 5

Chapter 2 Installation and Maintenance

Only trained service personnel should install and maintain the Power Supply.

Prior to installing the Power Supply utility line voltage must be routed to the enclosure. Local, state, federal and/or National Electric Code (NEC) regulations regarding location, permits and electrical wiring must be adhered to.

Do not operate the Power Supply where the temperature and humidity are outside the specified limits. See Specifications in this manual.

Unpacking

Inspect the unit upon receipt. Notify the carrier if there is damage. The packaging is recyclable; save it for reuse or dispose of it properly.

Check the package contents. The package contains the power supply and product documentation.

CTFLP Enclosure

Side View Showing Mounting Bracket

Mounting Bracket

Models Supported

Model Number

CTFLPH120

CTFLPH220

Description

ENCL, CTFLP 120VAC

ENCL, CTFLP 220VAC

3

Image 5
Contents BroadBand Ctflp Series Page General Information SafetyElectrical Warnings Overhead Warnings LiftingEnvironmental Specifications SpecificationsUnpacking Installation and MaintenanceCtflp Enclosure Models SupportedBottom View Ctflp Enclosure InstallationWiring Page Ensure the Ctflp module circuit breaker is OFF Installing the FLM Power SupplyIndex Description Operation Auxiliary Power SupplyInitial Startup and Performance Verification Shut DownOperation Interval Troubleshooting and MaintenanceMaintenance Visual Inspection CleaningWiring Harness Replacement Euro Block Replacement Indicator Lamp ReplacementHow to Contact APC Service, Contact and Warranty InformationService Regulatory Approval Limited Warranty