APC 990-1031, SYPM2KU, SYBT2 installation manual Vin

Page 22

5.Record input voltages below and compare the values with the measured voltages from step 1. If the two measurements are significantly different, contact APC Symmetra technical support.

Vin 1: ________________________________________________________

6. Switch the maintenance bypass switch on.

Disregard any LED indicator or fault messages on the PowerView.

Record the output voltage, below, and compare the value with Vin 1 from step 5. If the two measurements are significantly different, contact APC Symmetra technical support.

Reported Output Voltage: Out ______________________ V _________________________ Hz

7.Test the EPO switch. The system enable switch should physically move to the Stand By position, and the system should shut down completely. If this does not occur, check the connections and the EPO switch to ensure that they are installed and functioning properly.

8.Successful completion of steps 1 through 7 indicate that the system wiring is properly installed. Turn off breakers and switches and shut down input power to the system. Reinstall all wiring access panels on the frame.

Electrical Installation Completed by: _____________________________________________________

____________________________________________________

____________________________________________________

18

Image 22
Contents APC Symmetra RM Installation Manual Limited Warranty Life Support PolicyTable of Contents List of Figures Electrical Safety Handling SafetyConventions Used in this Manual Deenergizing Safety Battery SafetyRecycling of Batteries Radio Frequency InterferencePage About Your UPS Description Option End Item SKULatin America, South America How To Contact APCNorth America Europe, Middle East, and AfricaProduct Overview Front View Component IdentificationUse only accessory devices labeled Symmetra compatible Rear View Component IdentificationPage System Block Diagram MIMInstalling the Symmetra RM UnpackingDetermine the Location of the Symmetra RM in the Rack Connect the Symmetra RM to its Power Source Install the UPS into the RackWire the Emergency Power Off EPO Switch Use only a qualified electrician to install the EPO wiringInstall Modules Into the Symmetra RM Frame CL2XConnect Equipment to the Symmetra RM 220/230/240 L1-N-G PDU Panel 200/208 L1-L2-G PDU PanelAppendix a Electrical Wiring Checklist Vin